Tag: academic building
SCHRADERGROUP Attends Great Valley School District’s Dedication Ceremony for the New 5/6 Center
On October 15th, SCHRADERGROUP (SG) team members attended the dedication ceremony celebrating the completion of the new 5/6 Center for Great Valley School District (GVSD) in Malvern, PA. The dedication ceremony commemorated the new, 166,000 SF, two-story 5/6 Center, now a next-generation educational facility that provides enhanced learning environments and generates a new sense of pride for the students, community, faculty, and staff.
District officials welcomed community members to tour the new facility and hear testimonials from Superintendent Dr. Daniel Goffredo, Principal Dr. Kyle Hammond, Board President David Barratt, additional District administrators, and current students. Following the ceremony, community members toured the new facility and heard from staff and students about the amenities and perks of their new school.
The new 5/6 Center rests on the site of the former District Administration building adjacent to the existing K.D. Markley Elementary School. A portion of the District Administration Building was demolished while the entirety of the original historic portion was restored, representing the connection to the school’s significant roots. Additionally, SG renovated the historic portion of the building to house the school’s STEM program, which operates a unique juxtaposition of a contemporary educational program with the historic structure. The new learning commons features a centralized Learning Stair in the atrium.
The new entrance to the school opens into the dining commons and a Learning Stair to view the stage. The stage is double-sided and accessible from the gymnasium as well. SG designed two music classrooms and an instrumental band room with optimal acoustic treatments and ample storage. The Media Center mirrors the STEM area where students can access the art studios and Maker Lab.
Superintendent Daniel Goffredo states “The Great Valley 5/6 Center is designed to be a school characterized by flexible learning spaces that accommodate the needs of students at this age. Like all our schools, the building provides a safe, nurturing, and child-centered space where students can learn and grow into responsible, talented, and caring community members. We are proud to show our community how their support translates into opportunities for the children in our schools.”
The new 5-6 Center provides the District with capacity relief at the middle school and four elementary schools as enrollments continue to climb within the District. The construction of the new facility serves as a unique opportunity to provide a facility specific to this transitional age group. We at SG are honored to have provided the GVSD students with this new facility.
SCHRADERGROUP Ranks in the ENR Mid-Atlantic’s Top Design Firms of 2024
The Mid-Atlantic region of Engineering News-Record (ENR) ranks the largest US-based design firms annually on their Top Design Firms list. This past June, SCHRADERGROUP (SG) ranked as a Top Design Firm and placed #83 on the list of outstanding firms. Additionally, they recognized SG’s Hatboro Horsham School District’s Keith Valley Middle School as the firm’s largest project to break ground in the prior year. We at SG are honored to receive these recognitions!
Project Highlight: Ben Franklin Middle School
In March of 2023, Ben Franklin Middle School officially opened its doors to the students and community of the Bristol Township School District. This project encompasses 118,000 SF of renovations and 38,000 SF of additions, transforming the school into a state-of-the-art learning environment.
SCHRADERGROUP (SG) completed the design for a full renovation of the existing building, implementing classroom reconfiguration to accommodate the growing student population and providing spaces for next-generation teaching and learning. Additional renovations include a new media center, cafeteria expansion, and the creation of multiple large group study areas providing the student population with more space and modern technology.
Additions to the building include a main lobby entry and reception area, an expanded administrative suite, two sets of Learning Stairs for student gathering, and additional classrooms and science labs. Each grade level has access to the Learning Stairs and its own dedicated Large Group Instruction, maximizing space for multimodal learning. Keeping in line with next-generational education methods, all students have access to the STEAM area, featuring the centralized library/media center, Tech Ed. Labs, and art classrooms. The layout of the school encourages students to research, make, and present their work efficiently.
Extensive site modifications include new turf and natural grass playing fields, parking lots and sidewalks, and stormwater management systems. The new, more spacious layout allows for safer, more accessible, and fluid movement during busy drop-off and pick-up times, particularly after separating the bus and car drop-off traffic loops.
Previously housed at Franklin D. Roosevelt Middle School, the student population now has an expanded facility with the latest technology and resources for next-generation learning. The transformed Ben Franklin Middle School is a symbol of progress for the future of this community. SG is thrilled to see the new middle school up and running and serving the Bristol Township community members.
Project Highlight: Anne Frank School
In August of 2022, Anne Frank School construction came to an end after major renovations and additions. The school was previously comprised of two buildings constructed in different eras: a 74,500 SF original school building constructed in 1962, and a smaller building: one of the School District of Philadelphia’s acclaimed Little School House structures. With the latest addition, SCHRADERGROUP successfully linked the buildings and formed a united academic facility, which now provides space for additional learning opportunities, centralized administration, and food service.
The addition features nine classrooms, a Learning Stair directly accessing the new media center, administrative and nursing suites, and an expansion of the Little School House cafeteria. Relocating the administrative suite allows the Anne Frank School to provide a centralized secure point of entry, thus improving the overall safety of students and faculty.
Anne Frank School is home to students from over forty nations, who speak over forty languages. The administration considers the school a model of diversity both in its population and available programs. With diversity as inspiration, SCHRADERGROUP designed the facility with multi-cultural and colorful graphics to celebrate the students’ heritage and backgrounds.
The original 1962 building is three stories and houses classrooms, the gymnasium, auditorium, and original cafeteria. This section of the school underwent a renovation consisting of new interior finishes, window systems, and general building systems.
SCHRADERGROUP optimized the layout of the existing school buildings through designs that benefit students and inspire creativity. The bridge linking the existing main building to the new addition is airy and colorful, with flexible seating to accommodate modern learning practices. The windows throughout the addition were designed with young learners in mind and provide a fun, colorful, and naturally lit area through which students can gain a new perspective.
The renovations and upgrades offer students up-to-date technology and amenities, encouraging growth through creative, student-centered spaces. The addition unites the school and allows it to function as a whole, rather than as separate parts. SCHRADERGROUP is honored to have worked on this project along with the School District of Philadelphia and wishes the students, administration, and families of Anne Frank School a bright future.
Photos: Halkin-Mason Photography
Phoenixville Area School District Hosts Groundbreaking Ceremony for its new Elementary School in East Pikeland Township
On Friday, December 8th, Phoenixville Area School District hosted its commemorative groundbreaking ceremony to kick off the construction phase of their new elementary school located on Hares Hill Road in East Pikeland Township, PA. The 98,500 SF facility will house 700 students from grades 2 through 6, alleviating overcrowding at the middle school by moving 6th grade students to the new building. This will be the first elementary school in East Pikeland since the previous school’s closing, and the Township residents are thrilled to welcome a new school to their community.
The school’s layout takes advantage of the existing terrain, creating a balanced, multilevel facility. Upon entering the school, the interior boasts an impressive Learning Stair, where students can socialize and participate in a collaborative learning environment. The Learning Stair leads to a specialized STEAM area on the second floor where the Art room, STEM room, and Media Center are located. One of the building’s key design features is an enclosed courtyard, providing a secure indoor-outdoor space for students to learn and play. The entire configuration of the facility promotes collaboration and a forward-looking educational experience.
SG understands the future of education involves new teaching methods emphasizing the importance of sustainability. With this in mind, solar panels will be installed on all south-facing and flat roofs, and a panel will be located in the courtyard for students to observe the benefits of this energy source. Additionally, through a rainwater collection system, students discover the benefits of collecting and reusing water for their courtyard gardens.
The community showed tremendous support at the groundbreaking ceremony, including students, parents, faculty, and staff, who echoed the excitement shown throughout the planning and design process. This new elementary school will be a landmark for Phoenixville Area School District, and SG is proud to have collaborated with the District on this achievement. The school is projected to open in the Fall of 2025.
To see more of our K-12 projects, click here.
Construction Advances for Great Valley School District’s New 5/6 Center
Great Valley School District is in the construction phase of its upcoming 5/6 Center. The new facility accommodates the district’s growing enrollment and provides unique spaces for students in this transitional age group to receive an education tailored to their needs. Recent construction progress on the exterior includes stone veneer finishing at the main entrance, wall and tile installation, metal roofing, and aluminum curtain wall and glazing installation.
Located on the same site as KD Markley Elementary School, the 5/6 Center creates a cohesive campus with improved circulation, dedicated bus drop-offs, and new playfields. The parent drop-off loop connects and serves both schools to alleviate congestion.
On the interior, classrooms, hallways, and learning stairs are emerging amidst the building’s evolving infrastructure. STEM spaces occupy what was the original 1939 schoolhouse, with the historic façade opening to the new library and media center. A set of Learning Stairs integrates the library, media center, Maker Lab, and flexible presentation space for fluid efficiency in conducting and presenting research. An atrium-style dining commons, with a second set of Learning Stairs, provides flexibility for dining and stage performances.
Those involved in the project, including the students and faculty, eagerly anticipate the new facility’s opening in the Fall of 2024. Construction momentum displays tangible success and instills excitement for the future.
To see more of our K-12 projects, click here.
Reading School District Breaks Ground for New STEM Academy
On Monday, November 13th, Reading School District hosted a groundbreaking ceremony for its new High School STEM Academy. This milestone commemorates tangible construction progress for the facility while also celebrating years of dedicated design, programming, and planning. SCHRADERGROUP (SG) is honored to have seen this project from its inception through to this noteworthy achievement.
The Reading High School STEM Academy will provide learning opportunities for students from Reading High School to study specific STEM-related disciplines: science, technology, engineering, and mathematics. This school will enhance the opportunity for students who strive to one day pursue careers in those fields. The facility features specially designed STEM classrooms, tech education and science labs, and a media center. Additionally, there are unique common spaces that promote learning and socialization, from the auditorium that can transform into a dining hall, to the rooftop courtyard where the students can safely interact without the burden of vehicle traffic nearby. The academy is set to open in August of 2025 and will accommodate 1,000 students.
SG is grateful for the opportunity to work with the Reading School District to make this envisioned facility a reality. The new STEM academy will greatly impact the quality of education available to students in the City of Reading.
We at SG would like to extend our best wishes to the students, faculty, and administration of the district.
To see more of our K-12 projects, click here.
Hazleton School District Hosts Three Celebratory Ribbon-Cutting Ceremonies to Honor New Construction Projects
Hazleton Area School District experienced tremendous growth, and over the past few weeks, unveiled its three latest projects: the Hazleton Area Academy, the Cyber Academy, and the Arts and Humanities Academy. These new academies not only address capacity issues, but add to the quality of education for students throughout the District. Each new facility had ribbon-cutting ceremonies commemorating these significant milestones, and SCHRADERGROUP (SG) is honored to have worked alongside the dedicated people who help contribute to student success.
The first ribbon-cutting celebrated the opening of the Hazleton Area Academy, the old site of the Hazle Township Early Learning Center, and it currently offers early intervention and pre-K enrollment, plus VITAL House independent living and lifestyle training for young adults with disabilities. Totaling 40,000 SF of renovation, this center utilizes a repurposed portion of the school to serve young students. SG worked alongside the District in crafting a design that provides essential tools and spaces for developing minds, student growth, and engagement. The Hazleton Area Academy features transitional spaces for early learners, adaptable café spaces to introduce the students to elementary-level dining, and a flexible indoor recreation area. VITAL House includes a classroom area and fully accessible simulated apartment living.
As for the Cyber Academy, the ribbon-cutting ceremony recognized its K-12 project opening. The Cyber Academy is a unique 8,200 SF facility in the Laurel Mall, catering to the demand for online learning. SG utilized state-of-the-art technology within the 22 interactive teaching offices. The Cyber Academy emphasizes the versatility and accessibility of virtual learning and activities. It boasts a student conference and testing area, a 1,200 SF EA Sports Arena, a student-run retail store, and a secure reception area with flexible meeting spaces. Students can now participate in virtual classes and clubs and can even earn a Hazleton Area School District diploma.
State representatives, news outlets, and the community attended the third ribbon-cutting ceremony for the Arts and Humanities Academy. The total area measures over 44,000 SF and is located in the CANO Industrial Business Park. Featuring a theater, dance studio, and vocal studio, the academy caters to students in grades 9-12 who want to further their artistic passions. SG designed the facility to accommodate performing arts, news, video, and other communications outlets.
Hazleton Area School District is a long-standing client of SG, and we are happy to contribute to bright futures for the next generation of students, faculty, and staff throughout the District.
West View Elementary School Completes Construction Topping-Off Milestone of New Addition
The construction team at North Hills School District’s West View Elementary recently installed the final steel beam, advancing the progress of its new addition. The installation of the final beam represents the hard work and dedication all the teams have put forward, furthering the construction process. Built in 1925, West View originally served as the first junior high school in the nation, now housing upwards of four hundred students as an elementary school.
The school’s new addition, designed by SCHRADERGROUP (SG), will be 113,000 SF and feature administrative, nursing, and classroom spaces on the first floor, with additional classrooms and an expanded library equipped with a STEAM classroom on the second floor. This added space will provide ample room for students to grow and succeed in their education.
Team members and school administrators signed the steel beams with pride and well wishes for the future of the students and the school. The addition’s projected finish date is January 2024, while additional renovations are set to coincide with West View’s centennial anniversary in 2025.
West View’s topping-off ceremony represents tangible progress toward the future of learning. SG proudly worked with the school district and the leadership of the elementary school on this new addition. We are honored to create a practical and essential space where students can further their knowledge and achieve their academic goals. SG considered the best technology, sustainable features, and updates to streamline the way students move, collaborate, and learn within the space.
To learn more about our K-12 projects, click here.
Photos c/o North Hills School District – Facebook
Keith Valley Middle School Recognized as an Outstanding Project in Learning By Design’s Fall 2023 Awards of Excellence Magazine
SCHRADERGROUP (SG) is proud to announce that our ongoing project, Hatboro-Horsham School District’s Keith Valley Middle School, has been recognized as an Outstanding Project in Learning By Design’s Fall 2023 Awards of Excellence magazine.
Learning By Design is a prestigious publication that recognizes outstanding educational design and construction projects. They evaluate facilities based on innovation, community needs, interior design, sustainability, functional design, and next-generation learning. Published three times a year, the magazine showcases top K-12 and higher education projects and architecture firms.
Keith Valley Middle School is a three-story educational building that accommodates students from grades 6 to 8, featuring flexible learning studios, small group instruction areas, and larger learning commons for student gathering and project-based instruction.
The new facility will prioritize flexibility and connectivity within the school and community, fostering hands-on and multimodal learning approaches to inspire and engage students. A central learning resource area connects the educational areas to the shared public spaces, which include the dining commons, auditorium, and library.
You can view the Fall 2023 issue of Learning By Design here. You can find Keith Valley Middle School on page 94!
To learn more about Keith Valley Middle School, please click here.