Tag: hardened
Franklin County, NC Breaks Ground on New E911 Communications Center
SCHRADERGROUP (SG) attended the official ceremonial groundbreaking for the new 911 Primary Public Safety Answering Point Facility on Wednesday, April 6th, 2022, in Louisburg, North Carolina. Principal Harry Pettoni represented SG at the event that was attended by the County Commissioners, County Manager, NC911 Board Executive Director, and County 911 Director.
The 911 Primary Public Safety Answering Point (PSAP) Facility will consist of a 6,000 SF communications center on a four-acre site adjacent to the existing Franklin County Sheriff’s facility, communication towers, and storage facilities. Sitework will include new stormwater system, sanitary sewer system, water lines, and electrical service to the building. New sidewalks, driveways, and parking lots will also be provided.
The non-hardened portion of the building will be structural steel framed on steel deck while the floor will consist of slab on grade concrete with conventional concrete spread footings. The hardened portion of the building will consist of a reinforced concrete masonry wall system. The roof structure will consist of structural steel framed with concrete slab on composite steel deck with PVC roofing systems. The exterior façade will be a mixture of brick, pre-cast concrete, cementitious panels, aluminum windows, storefront, and curtainwall systems.
This project is funded through a grant funding award from the North Carolina 911 Board. SG provided the programming, schematic design, design development, construction administration, and permitting documents for this new facility.
The facility is scheduled to open in December 2022.
If you would like to learn more about Franklin County, click here.
To learn more about SG’s work in the Public Safety Sector, please click here.