Tag: public school design

Project Highlight: Anne Frank School

In August of 2022, Anne Frank School construction came to an end after major renovations and additions. The school was previously comprised of two buildings constructed in different eras: a 74,500 SF original school building constructed in 1962, and a smaller building: one of the School District of Philadelphia’s acclaimed Little School House structures. With the latest addition, SCHRADERGROUP successfully linked the buildings and formed a united academic facility, which now provides space for additional learning opportunities, centralized administration, and food service.

The addition features nine classrooms, a Learning Stair directly accessing the new media center, administrative and nursing suites, and an expansion of the Little School House cafeteria. Relocating the administrative suite allows the Anne Frank School to provide a centralized secure point of entry, thus improving the overall safety of students and faculty.

Anne Frank School is home to students from over forty nations, who speak over forty languages. The administration considers the school a model of diversity both in its population and available programs. With diversity as inspiration, SCHRADERGROUP designed the facility with multi-cultural and colorful graphics to celebrate the students’ heritage and backgrounds.

The original 1962 building is three stories and houses classrooms, the gymnasium, auditorium, and original cafeteria. This section of the school underwent a renovation consisting of new interior finishes, window systems, and general building systems.

SCHRADERGROUP optimized the layout of the existing school buildings through designs that benefit students and inspire creativity. The bridge linking the existing main building to the new addition is airy and colorful, with flexible seating to accommodate modern learning practices. The windows throughout the addition were designed with young learners in mind and provide a fun, colorful, and naturally lit area through which students can gain a new perspective.

The renovations and upgrades offer students up-to-date technology and amenities, encouraging growth through creative, student-centered spaces. The addition unites the school and allows it to function as a whole, rather than as separate parts. SCHRADERGROUP is honored to have worked on this project along with the School District of Philadelphia and wishes the students, administration, and families of Anne Frank School a bright future.

Photos: Halkin-Mason Photography

West View Elementary School Completes Construction Topping-Off Milestone of New Addition

The construction team at North Hills School District’s West View Elementary recently installed the final steel beam, advancing the progress of its new addition. The installation of the final beam represents the hard work and dedication all the teams have put forward, furthering the construction process. Built in 1925, West View originally served as the first junior high school in the nation, now housing upwards of four hundred students as an elementary school.

The school’s new addition, designed by SCHRADERGROUP (SG), will be 113,000 SF and feature administrative, nursing, and classroom spaces on the first floor, with additional classrooms and an expanded library equipped with a STEAM classroom on the second floor. This added space will provide ample room for students to grow and succeed in their education.

Team members and school administrators signed the steel beams with pride and well wishes for the future of the students and the school. The addition’s projected finish date is January 2024, while additional renovations are set to coincide with West View’s centennial anniversary in 2025.

West View’s topping-off ceremony represents tangible progress toward the future of learning. SG proudly worked with the school district and the leadership of the elementary school on this new addition. We are honored to create a practical and essential space where students can further their knowledge and achieve their academic goals. SG considered the best technology, sustainable features, and updates to streamline the way students move, collaborate, and learn within the space.

To learn more about our K-12 projects, click here.

Photos c/o North Hills School District – Facebook

HHSD Keith Valley Construction Update!

Exciting times are upon us as we witness Hatboro-Horsham School District’s NEW Keith Valley Middle School rise out of the ground. Incredible progress has been made over the first summer of construction and the new state-of-the-art facility beginning to take shape. Ongoing work includes foundations, concrete slabs, concrete retaining walls, and the erection of structural steel.

Photography by D’Huy Engineering, Inc

The NEW Keith Valley Middle School is being constructed in the foreground while the old Keith Valley Middle School remains in operation in the background.

The foundation work for Keith Valley Middle School commenced about three weeks ago. These vital structures are the bedrock of our future, ensuring the stability and longevity of the building. As each day passes, we see the foundations grow stronger, laying the groundwork for a new era in education at Keith Valley Middle School.

The classroom wings are rising from the ground while new underground stormwater basins are excavated.
The site is buzzing with activity on a daily basis with earthwork underway to install stormwater basins and crush the massive field of rock that was unearthed during construction. Foundations and massive retaining walls are nearly complete. Concrete slabs have been poured for the classroom pods and administrative wing. Most impressive is the structural steel that has been erected for the four 3-story classroom pods.

Photography by D’Huy Engineering, Inc

Starting in the Fall of 2025, the impressive 275,000 square foot facility will house up to 1,200 students in grades 6 through 8 with innovative and flexible learning spaces throughout the school. The students and staff of Hatboro-Horsham school district eagerly await the opportunity to utilize their new facility, which will take learning to a new level within the District. Until then, they have the best seat in the house to watch their new home be built one day at a time.

Perhaps the most striking sight on the construction site is the soaring steel framework. With three of the four educational wings already erected, it’s awe-inspiring to witness the structure reaching toward the sky.

Please click the image above to see a drone view of the construction site.
Videography shot by D’huy Engineering, Inc.

The transformation of Keith Valley Middle School’s renovation is a testament to progress, determination, and vision. As we continue this exciting journey, we invite you to stay tuned for more updates.

To see more K-12 projects done by SCHRADERGROUP, please visit our website here.

SCHRADERGROUP attends Franklin County 9-1-1 Ribbon Cutting

SCHRADERGROUP (SG) had the pleasure of attending the Franklin County Ribbon Cutting event in North Carolina on Tuesday, September 12th, 2023, in celebration of opening its new 9-1-1 communication center.

The 911 communication center, recognized as a Public Safety Answering Point (PSAP), holds a pivotal role in emergency response and public safety. Its core mission revolves around efficiently and effectively receiving, processing, and dispatching emergency calls and services.

The new 911 communication center also serves as the crucial liaison between the general public and emergency response agencies across Franklin County. The County received approximately $4 million through the NC911 Grant program to develop an advanced emergency communication center covering 5,300 square feet. This cutting-edge facility is located on a 3.90-acre site adjacent to the current public safety and detention center.

SG served as both the architect and structural engineering firm for the new emergency communication center. We are delighted to have engaged the expertise of the SG team, comprised of seasoned professionals, to design this essential infrastructure facility. It is instrumental in managing emergency calls, deploying the requisite resources, and ensuring a well-coordinated response to emergencies. Ultimately, this effort contributes to the preservation of lives and the enhancement of public safety across Franklin County.

Among those present was Kimberly Denton, Franklin County Manager, who welcomed and commenced the ceremony. Speeches were delivered by Michael S. Schriver, Chairman of the Franklin County Commissioners, Pokey Harris, Executive Director of the NC 911 Board, and Kimberly Denton herself. Christy Shearin, FC 911 Director, presided over both the ribbon-cutting ceremony and the closing remarks.

To see more projects we’ve worked on, please visit our website here.

SCHRADERGROUP: Enhancing Your Community with Next Generation Learning Environments

WE BELIEVE ACADEMIC DESIGN TRULY IS THE DESIGN FOR THE FUTURE

Over 19 years as a firm, SCHRADERGROUP (SG) completed over 200 projects in design for education and devoted the majority of its practice to learning environments. We are focused on creating learning environments specific to your vision for developing the leaders and thinkers for tomorrow.
Our Partners and Associates have over three decades of experience in academic facility design and are involved with school associations locally, nationally, and internationally (PASBO, DVASBO, NSBA, PSBA, A4LE, and others.) With this experience, the SG leadership continues to be committed to academic design to ensure the best experience for you.

SG employs 40+ full-time professional staff and is a full-service architecture firm offering planning and design services in the areas of architecture, structural engineering, planning, interior design, and construction administration. SG has the capacity to design over $400 million in construction projects per year.
The SG team works diligently to deliver projects in the most timely and cost effective manner and offers solutions that will satisfy programming standards of facilities nationally. With this effort, the stage is set for a design that will be entirely appropriate to its setting while satisfying the ergonomic needs of the using agencies.

Check out our a few of our K-12 Projects here.
Downloads of our K-12 flyer, brochure, and SOQ are available here.
And downloads of our tour book and brochure on our star project, Upper Merion Area High School, are available here.

Upper Merion Area School District’s Upper Merion Area High School Recognized as an Outstanding Project in American School & University’s Fall 2022 Architectural Portfolio

SCHRADERGROUP (SG) is proud to announce that our recently completed project, Upper Merion Area School District’s new Upper Merion Area High School, has received an Outstanding Project Award from American School & University for its Fall 2022 Architectural Portfolio.

SG is excited to have another project featured in this prestigious publication. We have thoroughly enjoyed working with Upper Merion Area School District (UMASD) and are honored to have this excellent school featured in this issue.

American School and University (AS&U) is a magazine dedicated to the planning, design, construction, retrofit, operations, maintenance, and management of education facilities. It is intended to showcase the latest trends, technologies, and strategies driving educational facilities and the market.

AS&U honors educational design projects each year through multiple design competitions. One of these competitions is the Architectural Portfolio, the premier showcase celebrating the best in education design.

After a complete community-engaged master planning process and subsequent successful new elementary school projects, Upper Merion Area School District (UMASD) began the process of creating a flagship facility to house the upper secondary programs for the District. A thorough process was utilized, including multiple user meetings and tours of state-of-the-art facilities throughout the United States.

The intent behind the facility is to provide career and higher education level spaces for the students of UMASD to engage in the 21st-century learning activities of “research, develop, and present!” Multiple hi-tech industry workspaces as well as contemporary higher education spaces were studied in the process of the development of this unique facility.

The 345,000 SF facility is connected to the existing middle school through the athletic and performing arts facilities to provide a full secondary campus. The resulting facility provides enriching opportunities for students from the traditional 6th-grade through 12th-grade ages.

A true “student commons” is the heart of the facility and will be an “all-day” area for multiple activities. The commons is a two-story open space with learning resources located on the second level to enhance the research and project-based components mixed with dining and food-based opportunities on the ground floor. After hours, the “commons” space will provide pre- and post-activity support for both the athletic as well as the performing arts complexes. A full competition gymnasium and competition swimming venue is the connector to the middle school. The performing arts complex provides a complete 650-seat theater with a balcony and all supporting performing arts spaces.

Student services, technology distribution, and support spaces are located between the commons space and the academic area. A three-story academic wing supports the core academic programs with a STEAM-based center, multiple project and team-based spaces, and a three-story learning stair. The learning stair connects all core programs vertically to enhance the cross-pollination of learning activities. Transparency is a key aspect of the facility’s design and is utilized to promote the visual connection between each of the learning activities.

The new facility was constructed while the existing high school on site was still occupied. The existing facility is currently being demolished, and new playing fields will be constructed in its place.

A unique site feature is an underground stream bisecting the site. The project chooses to highlight that challenge by exposing the stream at its outfall within a new outdoor amphitheater and teaching area. This outdoor space enhances internal building program opportunities by connecting them to the exterior. The stream provides for science-based learning activities directly on campus. The new facility allows the students of UMASD to have tremendous additional learning opportunities.

You can view our entry in the Fall 2022 Architectural Portfolio issue of American School & University on page 73 here.

Learn more about the Upper Merion Area High School here.

SG is proud to have partnered with Upper Merion Area School District. Learn more about this great school district here.

SCHRADERGROUP Attends 36th Annual DVASBO Trade Show

SCHRADERGROUP (SG) recently attended the Delaware Valley Association of School Board Officials (DVASBO)’s 36th Annual Trade Show on Wednesday, November 9th at the Greater Philadelphia Expo Center in Oaks, PA.

SG was proud to attend and exhibit at this conference once again. It was great to return to the trade show this year and to see so many friendly and familiar faces. SG was proud to assist in DVASBO’s mission of developing and supporting leaders in school business operations for the counties of Bucks, Chester, Delaware, and Montgomery.

The Trade Show was attended by Managing Partner David Schrader and Associate Devin Bradbury. The day included prize drawings, seminars, exhibitions, breakfast, and lunch.

It was great to be at a trade show again and to physically see everyone and talk to people face-to-face. We had great fun connecting with school business officials and we look forward to attending again next year!

DVASBO is a regional chapter of the Pennsylvania Association of School Business Officials (PASBO). For nearly five decades, DVASBO has been supporting school professionals in Bucks, Chester, Delaware, and Montgomery counties. The organization currently has over 1,000 members and is devoted to providing members with education, training, professional development, and timely access to legislative and policy news. The SG team would like to thank the DVASBO staff for organizing this trade show. To learn more about DVASBO, click here.

To learn more about SCHRADERGRPOUP’s commitment to educational facilities, click here.

SCHRADERGROUP Presents at the 2022 EDspaces Convention in Portland, Oregon

SCHRADERGROUP (SG) attended the EDspaces Education Conference from Wednesday, November 2nd to Friday, November 4th, 2022 at the Oregon Convention Center in Portland, OR. SG Managing Partner David Schrader and SG Associate Danie Hoffer represented SCHRADERGROUP at the conference.

EDspaces is a place where innovation transforms learning environments. Attendees learned about industry trends, fresh perspectives, and innovative case studies. Professionals from across the country attended to contribute to collective industry knowledge and to add their own voices to the conversation surrounding the future of learning.

EDspaces featured a curated, multi-track educational and professional development series of 60+ education sessions conducted in classrooms designed by visionary A+D firms that competed to share their innovative ideas for the future of learning.

David and Danie were joined by Upper Merion Area School District (UMASD) Superintendent Dr. John Toleno and Upper Merion Area High School (UMAHS) Principal Jonathan Bauer for a special “EDsession” focused on UMAHS. The session, titled, “Student-Focused Design to Inspire Personal Achievement – the Next Generation High School,” explored how technology, space, and pedagogy converge to impact student success. The session profiled how local businesses and industries inspired the design of the new High School in King of Prussia, a suburb of Philadelphia. The session included a  discussion on the educational limitations of the existing traditional high school designed in the 1960s as compared to the design of the new high school. The new facility provides higher education level spaces to engage in interactive learning activities of “research, develop, and present!” Spaces integrated throughout offer opportunities in flexible spaces to complement how different students learn.

The presentation visually immersed participants in the design of the school with a fly-around of the building. Using 3-D modeling technology, this tool is used throughout the design process to engage the client and allow the end user to experience the space design from the very early design stages to the full design development including the interior finishes. Participants will experience the volume of the spaces and how students will move through the building.

In addition to the speaking opportunities, attendees were also invited to tour nearby next-generation learning facilities and to attend a symposium on educational disruption. Thank you to Discovery High School, James Faubion Elementary School, and Vancouver Innovation Technology & Arts Elementary School for letting us tour your wonderful schools!

SG was proud to attend this conference again and we are very excited to attend in Charlotte, NC in 2023!

To learn more about EDspaces, click here.

To learn more about SCHRADERGROUP’s commitment to creating 21st Century learning environments, click here.

SCHRADERGROUP Thanks Ed Kirkbride for Helping Shape SG Careers

SCHRADERGROUP (SG) would like to extend the sincerest “Thank You” to Edward E. Kirkbride, NCARB, REFP for the considerable impact he has had on multiple SG employees in their career.

Ed is an educational architectural consultant who had similar involvement in the Association for Learning Environments (A4LE), formerly the Council of Educational Facility Planners International (CEFPI). His work with the organization has brought cutting-edge educational facility concepts and programs to fellow professionals across the globe and he has been involved in the design and construction of a significant quantity of school facilities in his career.

“A very good friend and fellow architect, Ed Kirkbride, mentored both David and me in our careers as architects. I first interned with Ed when I was 18 years old while finishing my senior year in High School. Ed’s firm designed the addition to my High School – East Senior High School in West Chester. My mother very creatively set up a meeting for me to meet Ed since I had expressed an interest in architecture. I ended up working for him the summer following my senior year. I also worked for him a couple of other times while going to college and during my career. David and I started working together around 1992 for Ed while he managed the L. Robert Kimball Office in West Chester. We are both very grateful to have such a great friend and mentor in our lives!” said SG Project Manager Mark Hitchcock.

“My greatest business mentors have been friends who run other types of businesses. I enjoy seeing diverse business models and learning about their challenges and experiences. A mentor in the K-12 planning business, Ed Kirkbride, introduced me to the Association for Learning Environments and promoted me within that organization. I hope I left the organization just a little better off than when I joined it. Thank you, Ed Kirkbride,” said SG Managing Partner David Schrader.

Click here to learn more about SCHRADERGROUP’s work with K-12 school districts.

Click here to learn more about the Association for Learning Environments (A4LE).

Be sure to follow SG on LinkedIn, Facebook, and Twitter for updates on all things SCHRADERGROUP!

SCHRADERGROUP Attends North Penn School District’s Ribbon Cutting Ceremony for Knapp Elementary School

SCHRADERGROUP (SG) attended the ribbon cutting ceremony celebrating the completion of an additions and renovations project to Knapp Elementary School for North Penn School District (NPSD) in Lansdale, PA on October 18th. Managing Partner David Schrader and Associates Danie Hoffer and Devin Bradbury represented SG at the event.

The ribbon cutting ceremony commemorated the transformation of this 1950’s facility into a next generation school. The 13,200 SF of additions and 64,800 SF of renovations to Knapp Elementary help facilitate interactive learning, provide enhanced learning environments with natural light, and generate a new sense of pride for the school and the community from the moment you enter its doors.

Community members were invited to see the new and improved school and to hear from district and community leaders. After a few words by the NPSD administration and David Schrader, the ribbon cutting ceremony was held. Following the ceremony, community members and attendees were invited to tour the new and improved facility and hear from staff and students about what they love about their new school.

The building renovations address ADA compliance issues and complete interior improvements throughout the school. The infrastructure and systems design incorporates energy-efficient construction, all-new lighting, HVAC, electrical systems, plumbing, technology, and fire alarm systems. The building design now serves 700 students.

The existing school was configured with classroom wings on either side of central enclosed spaces that housed the administration offices, kitchen, and cafeteria. As part of the renovation, a third classroom wing was added for grades 5-6 to accommodate the population and to eliminate the modular classrooms on-site. The central core was reconfigured to pull the dining commons directly across from the main entrance lobby and the roof structure was raised to introduce natural light into the space through clerestory windows. The library/resource center was relocated to the former cafeteria which now opens into a large group instruction area that is an extension of the dining commons. Internally connected to the two existing classroom wings and the third newly added classroom wing, these core spaces offer a variety of instructional areas in addition to small group instruction rooms provided in the classroom wings for pull-out instruction. The administration was relocated to the former library area directly adjacent to the main entrance which could now be secured.

To clearly identify the main public entrance to the school, the entry features a tall, glass-enclosed volume further marked by the prominent entrance canopy leading to it. This serves as the parent drop-off area with a new entry to the side of the addition serving as a separate bus loop. Sufficient parking is provided in the existing parking lot for staff and visitors with the bus loop used for parking for off-hour events. Outdoor facilities include new paving and sidewalks, hardscape and softscape play areas, one playfield, and open space.

SG would like to express our gratitude to the entire NPSD team for their contributions to improving their district’s schools. We would also like to thank our consulting team for all of the wonderful collaborative work done on this project.

To learn more about SCHRADERGROUP’s commitment to design for education, please click here.

To learn more about the North Penn School District, click here.