Tag: School District

SCHRADERGROUP Attends North Penn School District’s Ribbon Cutting Ceremony for Knapp Elementary School

SCHRADERGROUP (SG) attended the ribbon cutting ceremony celebrating the completion of an additions and renovations project to Knapp Elementary School for North Penn School District (NPSD) in Lansdale, PA on October 18th. Managing Partner David Schrader and Associates Danie Hoffer and Devin Bradbury represented SG at the event.

The ribbon cutting ceremony commemorated the transformation of this 1950’s facility into a next generation school. The 13,200 SF of additions and 64,800 SF of renovations to Knapp Elementary help facilitate interactive learning, provide enhanced learning environments with natural light, and generate a new sense of pride for the school and the community from the moment you enter its doors.

Community members were invited to see the new and improved school and to hear from district and community leaders. After a few words by the NPSD administration and David Schrader, the ribbon cutting ceremony was held. Following the ceremony, community members and attendees were invited to tour the new and improved facility and hear from staff and students about what they love about their new school.

The building renovations address ADA compliance issues and complete interior improvements throughout the school. The infrastructure and systems design incorporates energy-efficient construction, all-new lighting, HVAC, electrical systems, plumbing, technology, and fire alarm systems. The building design now serves 700 students.

The existing school was configured with classroom wings on either side of central enclosed spaces that housed the administration offices, kitchen, and cafeteria. As part of the renovation, a third classroom wing was added for grades 5-6 to accommodate the population and to eliminate the modular classrooms on-site. The central core was reconfigured to pull the dining commons directly across from the main entrance lobby and the roof structure was raised to introduce natural light into the space through clerestory windows. The library/resource center was relocated to the former cafeteria which now opens into a large group instruction area that is an extension of the dining commons. Internally connected to the two existing classroom wings and the third newly added classroom wing, these core spaces offer a variety of instructional areas in addition to small group instruction rooms provided in the classroom wings for pull-out instruction. The administration was relocated to the former library area directly adjacent to the main entrance which could now be secured.

To clearly identify the main public entrance to the school, the entry features a tall, glass-enclosed volume further marked by the prominent entrance canopy leading to it. This serves as the parent drop-off area with a new entry to the side of the addition serving as a separate bus loop. Sufficient parking is provided in the existing parking lot for staff and visitors with the bus loop used for parking for off-hour events. Outdoor facilities include new paving and sidewalks, hardscape and softscape play areas, one playfield, and open space.

SG would like to express our gratitude to the entire NPSD team for their contributions to improving their district’s schools. We would also like to thank our consulting team for all of the wonderful collaborative work done on this project.

To learn more about SCHRADERGROUP’s commitment to design for education, please click here.

To learn more about the North Penn School District, click here.

SCHRADERGROUP Sponsors and Attends the Council Rock Education Foundation’s 3rd Annual Golf Classic

SCHRADERGROUP (SG) attended the Council Rock Education Foundation’s third annual Golf Classic this summer. The event was hosted at the Philmont Country Club in Huntingdon Valley, PA on June 20th, with proceeds being used to support innovative K-12 S.T.E.A.M. (Science, Technology, Engineering, The Arts, and Mathematics) programs and projects for the students at Council Rock School District.

SG was proud to once again be a Bogey Sponsor for this great cause. It is always a pleasure to continue our tradition of support for Council Rock School District and all of the tremendous benefits that come from such an important fundraiser. As educational planners and architects, SG is always looking for new ways to support educational districts and foundations that are committed to the success of their students.

SCHRADERGROUP_Attends_Council_Rock_School_District_Golf_Outing_V2

SG team members Mark Adamiak, Eric Weiss, and Chris Farmer joined Terry DeGroot, Principal of Terraform Engineering, on the Terraform Team. This year, the Council Rock Education Foundation celebrates its 14th year of supporting S.T.E.A.M. Innovation projects, 21st Century Literacy, Youth Leadership, and Environmental Engagement for the district’s students. SG is proud to support an organization that is so dedicated to engaging and assisting students in developing their critical thinking skills.

Events like these are important to the success of a school district and its students, as it allows the funding of programs that would otherwise not be covered in the annual budget. SG would like to thank the dedicated members of the foundation for organizing this great event and we look forward to sponsoring the next one!

Learn more about SCHRADERGROUP’s work with Council Rock School District and other School Districts in the region here.

Learn more about the Council Rock Education Foundation here.

3_SCHRADERGROUP_Council-Rock-Education-Foundation-Golf-Classic

 

Great Valley School District Breaks Ground on New 5/6 Center

SCHRADERGROUP (SG) attended the official ceremonial groundbreaking for the new 5/6 Center for Great Valley School District (GVSD) on Monday, July 18th. SG Managing Partner David Schrader and Associate Danielle V. Hoffer attended the event with GVSD board members, administration, and the design team.

1-Design-Team-1_SCHRADERGROUP_Great-Valley-School-District_5-6-Center_Groundbreaking-Ceremony

As a result of a comprehensive Facility Assessment and Master Plan, the option to build a new 5-6 Center will provide the district relief at the four K-5 elementary schools and 6-8 middle school as enrollments continue to climb. The construction of a new facility provides a unique opportunity to design a facility specific for this transitional age group to accommodate 900 students. Based on the teaming model, the academic wing will be comprised of four classroom clusters per grade level on each floor.

2-Exterior-Rendering_SCHRADERGROUP_Great-Valley-School-District_5-6-Center_Groundbreaking-Ceremony

The new school will be located on the site currently serving the K.D. Markley Elementary School and the District Administration Building. A portion of the existing District Administration Building will be demolished with the original historic portion of the building maintained. The former historic building will be repurposed as the bus drop-off entrance to the school. A bridge connects the two-story academic building on the lower side of the site to the public spaces on the upper side. The sitework will include modifications to the existing site circulation, including a separate bus drop off for both the new 5-6 Center and the K. D. Markley Elementary School, as well as parking and playfields to accommodate the new construction and program.

3-Interior-Media-Center_SCHRADERGROUP_Great-Valley-School-District_5-6-Center_Groundbreaking-Ceremony

The historic portion of the building will be renovated to house the school’s STEM program and will serve as the back drop for the media resource area. The central 2-story learning commons in the academic core of the building features a learning stair to provide a vertical connection from the first to second floor overlooking the space.

4-Interior-Dining-Commons_SCHRADERGROUP_Great-Valley-School-District_5-6-Center_Groundbreaking-Ceremony

The main entrance opens into the dining commons with the stage. Tiered seating allows this multi-purpose space to serve as a performance area. The stage is also accessible from the gymnasium side to provide options for different venues.

This facility is scheduled to open in the fall of 2024.

To learn more about Great Valley School District, please click here.

To learn more about SCHRADERGROUP’s commitment to design for education, please click here.

Governor Mifflin School District Breaks Ground on New Community Athletic Center

SCHRADERGROUP (SG) attended the official ceremonial groundbreaking for the new Community Athletic Center for Governor Mifflin School District (GMSD) on Tuesday, May 17th. SG Associates Danielle V. Hoffer and Devin Bradbury attended the event and provided SCHRADERGROUP hard hats to officially commemorate the beginning of construction. The event was attended by GMSD board members, administration, faculty, students, parents, local officials, state representatives, and even the GMSD mascot, the Mifflin Mustang!

1_SCHRADERGROUP-Attends-Governor-Mifflin-SD-Community-Athletic-Groundbreaking-Ceremony

The event was also attended by the Greater Governor Mifflin League (GGML), a community organization which manages a week-long community fair known as “Community Days,” which enables local organizations to raise funds and also bring the community closer together through amusement rides, food and game stands, and nightly entertainment. The GGML presented the district with a $10,000 donation towards the project.

2_SCHRADERGROUP-Attends-Governor-Mifflin-SD-Community-Athletic-Groundbreaking-Ceremony

The Governor Mifflin School District Community Athletic Center is a vision conceived by the community for the community. The new building will be located on the existing secondary school campus, which is shared with the 7-8 Middle School, 9-12 High School, and the District’s Education Center. To address overcrowding at the middle school, along with system and infrastructure issues at both schools, the construction of the new community athletic building at the center of the campus will serve multiple purposes. Once the construction of the new athletic building is completed in the summer of 2023, the existing physical education spaces in the middle school and high school will be relocated to the new facility. This will allow the existing gymnasium and locker room spaces in the middle school and high school to be converted to other programs to support next generation learning.

3_SCHRADERGROUP-Attends-Governor-Mifflin-SD-Community-Athletic-Groundbreaking-Ceremony

The community athletic building will house the school district’s main competition gym (which is currently off-campus) with a seating capacity of 2,000. Support spaces include locker rooms, a football locker room with equipment drying facilities, team rooms, and a running track around the perimeter of the upper level of the main gymnasium. The second floor will house the wrestling room for practices, a multi-purpose room that can accommodate anything from meetings and physical education classes to sports training, and a fitness room that can be used by the public after hours. A sports medicine training room is strategically located at the main gymnasium entrance with an exterior entrance directly adjacent the stadium for treatment of sports injuries.

4_SCHRADERGROUP-Attends-Governor-Mifflin-SD-Community-Athletic-Groundbreaking-Ceremony

Central to the community, the school district offers many services to the public that will be further enhanced by the new athletic community building. To work within the context of the site, similar materials to the other campus buildings have been incorporated with glass to provide natural light into the spaces. When lit up at night, the building will literally be a beacon of the community.

5_SCHRADERGROUP-Attends-Governor-Mifflin-SD-Community-Athletic-Groundbreaking-Ceremony

This facility is scheduled to open in August 2023.

To learn more about Governor Mifflin School District, please click here.

To learn more about the Greater Governor Mifflin League Community Days, please click here.

To learn more about SCHRADERGROUP’s commitment to design for education, please click here.

6_SCHRADERGROUP-Attends-Governor-Mifflin-SD-Community-Athletic-Groundbreaking-Ceremony

Tim Ziegler, GMSD Director of Operations, and Pat Tulley, GMSD Athletic Director, were both instrumental in working with SG and the design team to capture the school district’s vision for the design of the new Community Athletic Center.

SCHRADERGROUP Attends A4LE Northeast’s 2022 Annual Regional Conference

SCHRADERGROUP (SG) recently attended the annual Association for Learning Environments (A4LE) 2022 Northeast Region Conference from April 6th to the 9th in Washington, D.C.

1_SCHRADERGROUP at A4LE NE Speaking Engagement

The conference was held at the Hyatt Regency Washington on Capitol Hill and was attended by SG Managing Partner David Schrader, Principal Harry Pettoni, Associate Danielle Hoffer, Interior Designer Charlotte Stoudt, and Project Architect Christopher Farmer.

In addition to our firm’s presence at this great event, SG’s own David Schrader and Danie Hoffer presented a special session along with the School District of Springfield Township’s (SDST) Director of Student Affairs, Dr. Catherine Van Vooren.

2_SCHRADERGROUP at A4LE NE Speaking Engagement

The session, titled “Enhanced Critical Thinking – For 5 Year Olds?” profiled how SDST and the community worked together to inspire the design of a new K-2 early learning center: the Enfield Elementary School located in Montgomery County, Pennsylvania. The session dove into how SG’s community-based workshop process and the resulting school design promotes critical thinking, student movement, collaboration, socialization, and communication through the principles of project-based learning for these very young and influential minds.

3_SCHRADERGROUP at A4LE NE Speaking Engagement

The theme for this year’s conference was “Blossoming Minds… A Time for Renewal and Optimism.” The event gathered school facility managers, architects, educators, school planners, engineers, and maintenance and industry experts to share in new conversations about the need for adapting our learning environments to new levels of mindfulness, as well as personalized comfort found in equality, inclusion, and the community. The conference focused on a strong understanding of the student experience and how designing with empathy allows for school planning to be driven by a focus on the future of learning, while still supporting capital needs, growth, and other logistical considerations of school systems.

The SG team would like to thank the dedicated staff of A4LE for organizing this great event and to all who attended our session, and we look forward to attending another A4LE conference very soon!

The Association for Learning Environments (A4LE) is a professional non-profit association dedicated to improving the places where children learn. The A4LE Northeast Region consists of Chapters that service the Northeast Region of the United States as well as nearby Canadian Provinces. To learn more about the A4LE Northeast Region, please click here.

To learn more about SCHRADERGROUP’s commitment to design for education, please click here.

Conference Sponorship Sign

A4LE Northeast Region Logo

SCHRADERGROUP to Speak at A4LE’s Northeast Conference!

SCHRADERGROUP (SG) is thrilled to announce that the team will be presenting at this year’s A4LE Northeast 2022 Annual Regional Conference! SG Managing Partner David Schrader and Associate Danie Hoffer will be presenting alongside the School District of Springfield Township (SDST) Director of Student Services, Dr. Catherine Van Vooren.

Please join us on April 7th at 10am at the Hyatt Regency Washington on Capitol Hill in Washington DC to hear this exciting session and to say hello!

The session, “Enhanced Critical Thinking – For 5 Year Olds?”, will profile how a community and school district worked together to inspire the design of a new K-2 early learning center: the Enfield Elementary School located in Montgomery County, Pennsylvania. The session will delve into how the community-based workshop process and the resulting school design promotes critical thinking, student movement, collaboration, socialization, and communication through the principals of project-based learning for these very young and influential minds.

The overarching theme of this year’s conference, “Blossoming Minds… A Time for Renewal and Optimism,” will gather school facility managers, architects, educators, school planners, engineers, and maintenance and industry experts to share new conversations in the need for adapting our learning environments to new levels of mindfulness, as well as personalized comfort found in equality, inclusion, and the community. The conference will focus on a strong understanding of the student experience and how designing with empathy allows for school planning to be driven by a focus on the future of learning, while still supporting capital needs, growth, and other logistical considerations of school systems. The conference will run from April 6th to April 9th.

The Association for Learning Environments (A4LE) is a professional non-profit association dedicated to improving the places where children learn. The A4LE Northeast Region consists of Chapters that service the Northeast Region of the United States as well as nearby Canadian Provinces. To learn more about A4LE’s Northeast 2022 Annual Regional Conference and to register for this great event, please click here.

To learn more about SG’s speaking session with the SDST at the A4LE Northeast 2022 Annual Regional Conference, please click here.

To learn more about SCHRADERGROUP’s commitment to design for education, please click here.

A4LE Northeast Region Logo

SCHRADERGROUP + Upper Merion Area School District Speaking at the A4LE Southeast Conference

Join SCHRADERGROUP Managing Partner, David Schrader, and Upper Merion Area School District’s Superintendent, Dr. John Toleno, this Tuesday, March 8th at the A4LE Southeast conference.

They will be providing a session on “Designing for the Next Generation of Student Learning to Prepare Them for the World” using the School District’s newest High School project as a case study. The discussion will provide:

  • How designing buildings supports 21st Century Learning
  • How spaces can be designed to reflect current business models
  • How it is possible to provide opportunities across multiple grade levels for advanced course offerings
  • And a comparison of students’ reflection on their learning experience in traditional post-industrial environments versus learning spaces centered around self-directed learning environments

The A4LE Southeast Conference is in Roanoke, Virginia, and the session starts at 3 pm, on Tuesday, March 8, 2022.

For more information, please visit:

https://www.a4le.org/Southeast/Virginia/2022_Chapter_Conference/Program.aspx

We hope to see you there!

SCHRADERGROUP to Speak at PASBO’s 2022 Annual Conference!

We are excited to announce that the SCHRADERGROUP (SG) team will be speaking and exhibiting at this year’s 67th PASBO Annual Conference & Exhibits in Hershey, PA from March 8th to the 11th in the Hershey Lodge. Stop by Booth 410 this year to say hello and meet the team!

SG is thrilled to attend this great event in person after last year’s conference was held virtually. We are even more excited to announce that the SG team will be partnering with previous clients and consultants to bring you a special panel this year: “SCHOOL OF THE FUTURE: The Next Generation of Safety and Security, HVAC and Virus Mitigation.” This panel discussion will be on Wednesday, March 9th from 10:45am – 11:45am. We hope to see you there!

“School districts are continually advancing the level of internal transparency and are including more unique and dynamic learning environments as they seek to adjust to changing learning styles and the increased use of technology.  Solutions required to respond to the recent pandemic have only exacerbated the challenges of delivering a higher caliber of education to the learner.  In response to these issues, school districts have had to evolve their thinking in terms of; safety, security, HVAC and virus mitigation.

Historic threats to schools have created the need to implement safety and security protocol and systems but now, for the first time in 100 years, we have encountered a health pandemic which became another threat to our students, faculty, staff, and community.  These compounded concerns create dynamic needs for school districts.  Threat assessments, emergency planning and ultimately implementation of protocols are critical to procedures going forward.  But further, those threats have modified the systems in buildings. It is critical that these become an underlying part of our process and systems so that all members of society can enjoy learning and community-based activities without actively feeling those threats. 

This panel is intended to discuss and debate these topics and to reveal some of the next generation thinking relative to these topics.”

More information on this special panel, as well as information about attending the conference, can be found here.

The Pennsylvania Association of School Business Officials (PASBO) is a statewide association with 3,000 members. They are devoted to providing their supporters with education, training, professional development, and timely access to legislative and policy news. Their membership base covers school professionals working in finance, accounting, operations, facilities, transportation, food service, technology, communications, human resources, purchasing, and safety services. While diverse in areas of specialty, all members share a common goal – to support classroom learning in schools during good and bad economic times through smart business practices. PASBO helps make that goal a reality.

Each year, PASBO provides an opportunity for school business officials to listen to keynote speaker presentations and attend information workshops that provide members with the opportunity to network with their peers. PASBO provides its members with the education, training, and professional development, as well as the timely access to legislative and policy news, needed to support this goal of developing and supporting leaders in school business operations.

Learn more about registering for the PASBO conference here.

FOOTER_SCHRADERGROUP_PASBO-Facilities-Transportation-Safety-Conference-Lancaster-Marriot

SCHRADERGROUP Attends PASBO Facilities, Transportation, & Safety Conference & Exhibits

SCHRADERGROUP (SG) recently attended the Pennsylvania Association of School Business Officials (PASBO) Facilities, Transportation, & Safety Conference & Exhibits in Lancaster, PA on November 4, 2021. This was the first time this conference was held in Lancaster.

The conference was held at the Lancaster Marriot & Convention Center, which is only a couple blocks away from our Lancaster office on King Street. SG exhibited at the conference in the convention hall and was honored to be a Bronze Sponsor for the event. SG team members Danielle Hoffer, Charlotte Stoudt, and Denis Brennan attended the trade show to connect once again with familiar faces and to meet many more.

1_SCHRADERGROUP_PASBO-Facilities-Transportation-Safety-Conference-Lancaster-Marriot

This year’s conference dialed the focus down to three key areas important to school business officials: facility management, student transportation, and school safety. School facility management affects teaching and learning, student and staff health, day-to-day building operations, and the long-range fiscal health of the district. Attendees included facilities directors and personnel, school safety personnel, business managers, and superintendents.

The SG team would like to thank the dedicated staff of PASBO for organizing this great event and to all attendees who stopped by our booth to chat and ask questions. We look forward to the annual conference that will be held from March 8-11, 2022 in Hershey, PA. Come find us at Booth 410 to chat about your projects and ideas for your school district’s needs.

2_SCHRADERGROUP_PASBO-Facilities-Transportation-Safety-Conference-Lancaster-Marriot

PASBO is a Pennsylvania-based, state-wide association with over 3,000 members. They are devoted to providing members with the education, training, professional development and timely access to legislation and policy news needed to run a school district smoothly and successfully. While their membership base varies greatly, the association has a common goal of supporting classroom learning through smart business practices. To learn more about PASBO and the work that they do, click here.

To learn more about SCHRADERGROUP’s work with K-12 schools, click here.

FOOTER_SCHRADERGROUP_PASBO-Facilities-Transportation-Safety-Conference-Lancaster-Marriot

SCHRADERGROUP Construction Progress – Summer 2021, Part 2

Now that summer has come to an end, a few SG projects are wrapping up while construction continues on many others. A few of the construction projects currently underway include the additions and renovations to Knapp Elementary School for the North Penn School District, the demolition of the existing Springfield High School and construction of new athletic facilities for the new high school, the new PennDOT District 6.0 Regional Traffic Management Center, the new Upper Merion Area High School, additions and renovations to two School District of Philadelphia Schools, Anne Frank Elementary School and Benjamin Franklin Middle School, the new Career and Advanced Technology Center for the Community College of Philadelphia, and additions and renovations to two Council Rock School District Schools, Hilcrest Elementary School and Sol Feinstone Elementary School, among others.

North Penn School District – Knapp Elementary School, Additions and Renovations

1-Knapp-Elementary_School-North-Penn_SCHRADERGROUP_Summer-Construction-Progress

In Lansdale, PA, a phased plan for additions and renovations to Knapp Elementary School is underway. This project has a complex phasing schedule in place so that classes can remain uninterrupted as the school year begins.

2-Knapp-Elementary_School-North-Penn_SCHRADERGROUP_Summer-Construction-Progress

The first phases of the project included classroom renovations, many of which are complete. The remaining classroom renovations are underway at various stages.

3-Knapp-Elementary_School-North-Penn_SCHRADERGROUP_Summer-Construction-Progress

The renovations to the core of the building, including the new entry, cafeteria, and LGI are ongoing. Steel and glulam beams are fully installed in all of these spaces. An important milestone, the completion of the main entrance, is fast approaching. This addition will act as the connector for the two parts of the school while the renovations to the core are underway. The students will be using the gymnasium as a temporary cafeteria this fall.

4-Knapp-Elementary_School-North-Penn_SCHRADERGROUP_Summer-Construction-Progress

Springfield School District – Springfield High School, Existing High School Demolition, Visitor Side Bleacher, and Athletic Fields

1-Springfield-High-School-Demo-Bleacher_SCHRADERGROUP_Summer-Construction-Progress

In Springfield, PA, demolition work is speeding up. The existing Springfield High School is substantially demolished, the stone retaining wall construction is ongoing, and lot paving has begun for parking. After the completion of the existing high school’s demolition, work will begin on new athletic fields, turf fields, and tennis courts where the original school stood.

2-Springfield-High-School-Demo-Bleacher_SCHRADERGROUP_Summer-Construction-Progress

The visitor side bleacher construction is progressing and is expected to be completed in time for the first home football game at the new high school and stadium.

3-Springfield-High-School-Demo-Bleacher_SCHRADERGROUP_Summer-Construction-Progress

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC)

In King of Prussia, PA, concrete slab placement at the new Regional Traffic Management Center has been completed on each floor. Waterproofing of the concrete footings is complete, the underground plumbing has been installed, and the steel column baseplates are in place.

1-PennDOT-Regional-Traffic-Management-Center_SCHRADERGROUP_Summer-Construction-Progress

The site retaining wall is complete, as is the majority of steel and decking. CMU installation in ongoing and interior metal stud framing has begun.

2-PennDOT-Regional-Traffic-Management-Center_SCHRADERGROUP_Summer-Construction-Progress

Upper Merion Area School District – New Upper Merion Area High School

1-Upper-Merion-Area-High-School_SCHRADERGROUP_Summer-Construction-Progress

Moving on down the road in King of Prussia, construction of the new Upper Merion Area High School continues. Structural steel framing for the major spaces is ongoing while the exterior envelope starts to give the building its form. Masons have been busy with brick work and CMU walls.

4-Upper-Merion-Area-High-School_SCHRADERGROUP_Summer-Construction-Progress

As concrete slabs are completed throughout the facility, MEP rough-in work continues closely behind. Activity on site recently picked up as carpenters started on the interior partitions.

3-Upper-Merion-Area-High-School_SCHRADERGROUP_Summer-Construction-Progress

Now that the underground tunnel is  complete, the gym and pool areas are getting footings and foundations started.

5-Upper-Merion-Area-High-School_SCHRADERGROUP_Summer-Construction-Progress

School District of Philadelphia – Anne Frank Elementary School, Additions and Renovation

1-Anne-Frank-Elementary-School_School-District-of-Philadelphia_SCHRADERGROUP_Summer-Construction-Progress

In Philadelphia, construction has moved quickly at Anne Frank Elementary School, with the addition complete in time for the new school year.

2-Anne-Frank-Elementary-School_School-District-of-Philadelphia_SCHRADERGROUP_Summer-Construction-Progress

Community College of Philadelphia – New Career and Advanced Technology Center

1-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

Staying with construction projects in Philadelphia, the new Career and Advanced Technology Center (CATC) for the Community College of Philadelphia is progressing nicely. All building trades have been working diligently on both the exterior and interior of the building, with the next major milestone being the completion of the building enclosure in the next few weeks.

2-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

The new CATC will offer excellent views of the Philadelphia Skyline. The project is on track for a February 2022 completion.

3-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

Bristol Township School District – Benjamin Franklin Middle School, Additions and Renovations

1-Benjamin-Franklin-Middle-School_School-District-of-Philadelphia_SCHRADERGROUP_Summer-Construction-Progress

North of Philadelphia, demolition work at Benjamin Franklin Middle School is complete and interior framing and stud work has started.

3-Benjamin-Franklin-Middle-School_School-District-of-Philadelphia_SCHRADERGROUP_Summer-Construction-Progress

Additionally, site work for the new addition is in progress, with concrete footings now installed.

2-Benjamin-Franklin-Middle-School_School-District-of-Philadelphia_SCHRADERGROUP_Summer-Construction-Progress

Council Rock School District – Hillcrest Elementary Schools, Additions and Renovations

1-Council-Rock-School-District_Hillcrest-Elementary-School_SCHRADERGROUP_Summer-Construction-Progress

Heading north towards Council Rock School District, SG has wrapped up interior demolition at the Hillcrest Elementary School, with the kitchen, administration, toilets and library areas completely demolished. Rough in has started throughout for all trades.

2-Council-Rock-School-District_Hillcrest-Elementary-School_SCHRADERGROUP_Summer-Construction-Progress

During construction, Hillcrest Elementary School students will be temporarily moved to a vacant CRSD school for the upcoming school year. The project is moving ahead quickly with E&S controls and fencing already in place.

Council Rock School District – Sol Feinstone Elementary Schools, Additions and Renovations

3-Council-Rock-School-District_Sol-Feinstone-Elementary-School_SCHRADERGROUP_Summer-Construction-Progress

Staying in Council Rock School District, SG is working on phased renovations for another elementary school, Sol Feinstone Elementary School. Unlike Hillcrest, which will have students attending classes at a nearby vacant elementary school, Sol Feinstone will be 100% occupied throughout construction. This will result in the construction of temporary classrooms and a temporary egress stair that contains a pathway for students to safely traverse while the addition is underway.

1-Council-Rock-School-District_Sol-Feinstone-Elementary-School_SCHRADERGROUP_Summer-Construction-Progress

The summer phases for this project are currently under construction, and interior and exterior demolition has recently started. E&S controls are in place and excavation for the new addition is currently underway. Pier footings and foundations at the new classroom addition are ongoing as well.

2-Council-Rock-School-District_Sol-Feinstone-Elementary-School_SCHRADERGROUP_Summer-Construction-Progress

It is always exciting to watch our design work become reality! We would like to thank our clients, consultants, contractors, and all other team members for your dedication and support of the on-going efforts for these projects!

Learn more about these and other exciting SCHRADERGROUP projects here!