West Whiteland Township Breaks Ground for New Public Works Facility
The West Whiteland Township staff, supervisors, and contractors broke ground on their new public works facility on Wednesday, November 8th. SCHRADERGROUP (SG) designed the 39,000 SF facility to accommodate the Township’s need for maintaining roads, sewer and storm systems, and public parks. The new facility design streamlines the way the public works department collaborates with each other and assists the community. Previously, West Whiteland had three separate outdated buildings spread across the Township, making it difficult to work at maximum efficiency. Now that the team’s space is consolidated and equipped with cutting-edge technology, they can upkeep the community better than before.
SG wanted the facility to operate at its fullest potential by including the necessary tools, technology, and areas for the team. The primary building on site will operate as an administrative suite, with dedicated mechanics bays to service fleet vehicles. Part of the building plan includes a work room, a wash bay, an equipment storage facility, and a garage, optimizing the way the team can share resources. Prior to this update, the team could not house the vehicles and equipment under one roof, and as a result, they were exposed to harsh weather. Additionally, the facility will feature open-air steel structures for storage on-site, provided by a pre-engineered metal building manufacturer for a cost-effective and flexible layout.
SG recognizes the importance of the work the team puts out daily and designed a building to meet the community’s needs. The public works facility is set to open in the Fall of 2024.