Category: News

SCHRADERGROUP Hosts Design Workshop for Great Valley School District for the Conceptualization of a New 5/6 Grade Center

After completing a district-wide facility assessment and master plan for the district in 2020, SCHRADERGROUP (SG) began a series of community workshops to identify priorities and to narrow the field of options for district-wide planning for Great Valley School District (GVSD). Based on the master plan, capacity analysis, and community meetings, the District opted to design a new 5/6 Grade Center on a site adjacent to the existing K.D. Markley Elementary School.

1_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

SCHRADERGROUP’s process includes community input through planning and design workshops. In the case of the new 5/6 Grade Center, SG teamed with GVSD to hold this workshop in the existing K.D. Markley Elementary School on April 21st. SG welcomed over 50 stakeholders to the workshop to hear a review of the process, virtually tour other state-of-the-art facilities, and discuss preferences for the new 5/6 Grade Center.

After a series of consensus building exercises, the team split into smaller groups and each group created multiple options for the new facility using the existing site and programming blocks. The SG team took away some valuable feedback from this process and is very excited to start the designs for the new center.

2_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

Learn more about Great Valley School District here.

See more of SCHRADERGROUP’s work with K-12 schools here.

3_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

SCHRADERGROUP Construction Progress – May 2021

As summer quickly approaches, construction work continues to accelerate on SCHRADERGROUP (SG) projects! The team has been hard at work with construction administration for a variety of projects, with some rapidly approaching final completion. A few of our construction projects underway include a new Emergency Operations Center in North Carolina, additions and renovations to the School District of Philadelphia’s Anne Frank Elementary School, the Community College of Philadelphia’s new Career and Advanced Technology Center, the new Upper Merion Area High School, and the new PennDOT District 6.0 Regional Traffic Management Center and Parking Structure, among others. A brief description of a few projects follow.

Chatham County, North Carolina – Emergency Operations Center (EOC)

Chatham_SCHRADERGROUP_May-Construction-Progress
In North Carolina, the grading of the site for the new Emergency Operations Center continues. Fine grading is completed on the east side of the site while work continues on the west side. The temporary entrance to the site has been removed and graded and work with the North Carolina Department of Transportation to connect the main entrance to the roadway has begun. Finally, the Cell Tower Structure was recently installed and the screening topsoil is complete.

School District of Philadelphia – Anne Frank Elementary School

1-Anne-Frank_SCHRADERGROUP_May-Construction-Progress

In Philadelphia, the additions and renovations to Anne Frank Elementary School are quickly progressing. The exterior brick work is now complete and the installation of windows and ceramic tile begins. Inside, the painting is still in progress while the acoustic ceiling tile grid installation begins.

2-Anne-Frank_SCHRADERGROUP_May-Construction-Progress

Community College of Philadelphia – Career and Advanced Technology Center

1-CCP-CATC_SCHRADERGROUP_May-Construction-Progress

In West Philadelphia, the steel framing is complete at the new Career and Advanced Technology Center for the Community College of Philadelphia and the crane has been removed. MEP rough ins above grade have started in addition to the Concrete Masonry Unit walls. This project is scheduled for substantial completion by February 2022.

2-CCP-CATC_SCHRADERGROUP_May-Construction-Progress

Upper Merion Area School District – Upper Merion Area High School

1-Upper-Merion-Area-High-School_SCHRADERGROUP_May-Construction-Progress

In King of Prussia, foundation work continues in the performing arts and gym/pool area of the new high school. In the classroom wing, concrete slabs have been poured. Out front, the curbs and asphalt have been installed in the parking lot. The most exciting update this month is that the site contractor is preparing to connect the site’s existing stream to the renovated stream area, which will be located near an outdoor amphitheater and teaching area to provide the students with science-based learning activities directly related to their campus.

2-Upper-Merion-Area-High-School_SCHRADERGROUP_May-Construction-Progress

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure

1-RTMC_SCHRADERGROUP_May-Construction-Progress

Another SG project in King of Prussia, the new RTMC facility’s foundation is progressing nicely. Heim Construction continues to advance the concrete footings and foundation walls. This week, waterproofing of the concrete footings began as well.

2-RTMC_SCHRADERGROUP_May-Construction-Progress

The new adjacent parking structure is swiftly approaching completion. Installation of metal panel and soffit systems at the Penthouse are underway. The glazing, batten installation, metal louvre, site sign foundation, parking striping, and asphalt paving are all complete. Additionally, electric charging stations have been installed.

3-RTMC_SCHRADERGROUP_May-Construction-Progress

As the weather improves and work continues, it is exciting to watch these projects come to fruition. We would like to thank all of our clients, consultants, contractors, and supporters for your dedication and support!

Learn more about these and other exciting SCHRADERGROUP projects here!

SCHRADERGROUP Attends the Enfield Elementary School Ribbon Cutting Ceremony for the School District of Springfield Township

SCHRADERGROUP (SG) recently attended the ribbon cutting ceremony for the new Enfield Elementary School for the School District of Springfield Township (SDST) in Erdenheim, PA on May 21st. The event commemorated the completion of the school district’s newest facility. Enfield Elementary School is a state-of-the-art K-2 Early Learning Center designed to support the school’s unique learning curriculum specifically designed for this young age group.

Several design team members represented the SG team at the event, joining SDST staff, faculty, students, local community members, and D’Huy Engineering Construction Managers, all of whom were gathered to celebrate the new facility’s completion.

1_SCHRADERGROUP_Springfield-Township_Enfield-Elementary-School-Early-Learning-Center_Ribbon-Cutting

The morning’s events began with reflections on the project from former Superintendent Dr. Nancy Hacker and former Principal Dr. Catherine Van Vooren, both of whom were instrumental in formulating the vision and in working with the design team from the early project conception and throughout the design. David Schrader presented Dr. Hacker, the School Board, and the School District of Springfield Township with the Spring 2021 Learning by Design Award for Outstanding Project, further recognizing this achievement.

Current Superintendent Dr. MaryJo Yannacone provided comments and then current Principal Dr. Meghan Markle noted that this new facility will help nurture the students to be “creative, caring and curious” young learners. She then proudly introduced a representative from each Enfield Elementary School grade level to say a few words on what they liked about their school. One young man from first grade remarked that the best thing about the school is that his older sister was jealous that he was able to attend the school and that she couldn’t, followed by the second-grade representative who closed her comments noting the school was “Spectacular!”. The ceremony concluded with the ribbon cutting pictured below to officially dedicate the opening of the school.

2_SCHRADERGROUP_Springfield-Township_Enfield-Elementary-School-Early-Learning-Center_Ribbon-Cutting

Following the ceremony, a library dedication and tree dedication were held, both dedicating plaques to community members involved with the District. An outdoor luncheon finished off the festivities for the day.

SG is honored to be a part of such a significant project for the District. We are grateful to have the opportunity to support the School District of Springfield Township and are proud of this new facility dedicated to the District’s youngest learners.

SG would also like to express our gratitude to the entire team for their contributions to the design and construction of this amazing school. Thank you to D’Huy Engineering, Snyder Hoffman Associates, Renew Design Group, Lobar Inc., Boro Construction, Philips Brothers, and Stan-Roch Plumbing.

Learn more about this exciting project here.

Learn more about the School District of Springfield Township here.

SCHRADERGROUP Sponsors and Attends the Council Rock Education Foundation’s 2nd Annual Golf Classic

SCHRADERGROUP (SG) recently attended the Council Rock Education Foundation’s second annual Golf Classic hosted at the Philmont Country Club in Huntingdon Valley, PA on May 19th. Proceeds from the event go to supporting innovative K-12 S.T.E.A.M. (Science, Technology, Engineering, The Arts, and Mathematics) programs and projects for the kids of Council Rock School District.

SG was proud to be a Bogey Sponsor for this exciting event, continuing our tradition of support for the Council Rock Golf Classic and all of the tremendous benefits that come from such an important outing. As educational planners and architects, SCHRADERGROUP (SG) is always looking for new ways to support educational districts and foundations that are committed to the success of their students.

1_SCHRADERGROUP_Council-Rock-Education-Foundation-Golf-Classic

The SG team attended the event with some well-known faces of the District. In addition to a great day of golf, the event included breakfast, lunch, games, awards, and prizes, with a reception following a beautiful day out on the course.

This year, the Council Rock Education Foundation celebrates its 13th year of supporting S.T.E.A.M. Innovation projects, 21st Century Literacy, Youth Leadership, and Environmental Engagement for the district’s students. SG is proud to support an organization that engages students and assists in developing their critical thinking skills, all while still having fun!

2_SCHRADERGROUP_Council-Rock-Education-Foundation-Golf-Classic

Events like these are important to the success of a school district and its students, as it allows the funding of programs that would otherwise not be covered in the annual budget. SG would like to thank the dedicated members of the foundation for organizing this great event.

Learn more about SCHRADERGROUP’s work with Council Rock School District and other School Districts in the region here.

Learn more about the Council Rock Education Foundation here.

3_SCHRADERGROUP_Council-Rock-Education-Foundation-Golf-Classic

SCHRADERGROUP Attends the North Carolina Sheriff’s Association Spring Meeting

SCHRADERGROUP (SG) recently attended the North Carolina Sheriff’s Association (NCSA) 2021 Spring Meeting from April 23rd  to the 26th in New Bern, North Carolina. The NCSA is made up of the state’s 100 sheriffs and the association works to strengthen the professional law enforcement services their offices provide to the people of North Carolina.

SG Principal Harry Pettoni operated the SG booth throughout the event that hosted training sessions, special speakers, and exhibitions that dealt with issues in law enforcement and the community. Events like these help sheriffs across the state figure out how to better serve their communities and to share techniques and strategies with their local counterparts.

1_SCHRADERGROUP_North-Carolina-Sheriffs-Association_Spring-Meeting

SG is proud to attend an event dedicated to the safety of the people of North Carolina. We had the pleasure to meet some new faces, connect with existing clients, and discuss current facility needs for NC Sheriffs.

SG is dedicated to attending as many public safety and law enforcement events as possible, as it provides crucial information and strategies in the design and construction of public safety facilities. Attending these events ensures we maintain our knowledge base in order to continue providing dynamic designs that are survivable and redundant.

Learn more about SCHRADERGROUP’s work in Public Safety here.

Learn more about the North Carolina Sheriff’s Association here.

2_SCHRADERGROUP_North-Carolina-Sheriffs-Association_Spring-Meeting

SCHRADERGROUP Hosts Design Workshop for Hatboro-Horsham School District to Determine the Future Configuration of the Keith Valley Middle School

2021 has been off to a busy start for Hatboro-Horsham School District (HHSD)! After hosting multiple conceptualization sessions in January and February and taking tours of example facilities throughout the Mid-Atlantic in March, the SCHRADERGROUP (SG) team conducted a planning workshop with HHSD staff, parents, and Hatboro and Horsham municipal officials last month.

The existing Keith Valley Middle School is aging and in need of serious repairs. There are ADA issues throughout the facility and upgrades are needed to the HVAC systems. Through prior studies and through a process conducted by D’Huy Engineering, it was determined that replacing the entire middle school was the most feasible option for the district. So, the next steps were to meet with the community members to design a replacement middle school that can better serve its students as part of a 21st century learning environment.

1_SCHRADERGROUP_Keith-Valley-Middle-School-Design-Workshop_Hatboro-Horsham-School-District

SCHRADERGROUP partnered with HHSD and D’Huy Engineering to host the workshop on April 8th. After an introductory process, the team split into smaller groups. Each group was given site plans and program blocks to brainstorm and envision the different aspects of the new school on the existing site. SG is very excited to take the next steps in creating a dynamic and functional middle school to serve the residents of Hatboro-Horsham School District.

2_SCHRADERGROUP_Keith-Valley-Middle-School-Design-Workshop_Hatboro-Horsham-School-District

Following the completion of the Crooked Billet Elementary School in 2020, this exciting project continues SG’s relationship with Hatboro-Horsham School District and all of the wonderful people who live, work and learn in the district.

Learn more about other SG projects at Hatboro-Horsham School District here.

Learn more about Hatboro-Horsham School District here.

3_SCHRADERGROUP_Keith-Valley-Middle-School-Design-Workshop_Hatboro-Horsham-School-District

SCHRADERGROUP Construction Progress – April 2021

SCHRADERGROUP’S projects are quickly becoming a reality as construction continued throughout April. The team has been hard at work with construction administration for a variety of projects. A few of our construction projects that are underway include: two projects for the School District of Philadelphia, the Community College of Philadelphia’s new Career and Advanced Technology Center, the new Upper Merion Area High School, and the new PennDOT District 6.0 Regional Traffic Management Center and Parking Structure.

School District of Philadelphia – Anne Frank Elementary School, Renovations

1_SCHRADERGROUP_Anne-Frank-Elementary-School_School-District-of-Philadelphia

Construction continues at Anne Frank Elementary School in northeast Philadelphia. Interior and exterior metal studwork and HVAC ductwork continues while exterior brick work is 80% complete. In the existing building, new VCT flooring has been installed.

2_SCHRADERGROUP_Anne-Frank-Elementary-School_School-District-of-Philadelphia

School District of Philadelphia – Paul L. Dunbar Promise Academy, Masonry Investigation

1_SCHRADERGROUP_Paul-Dunbar-Academy_School-District-of-Philadelphia

Moving into Templetown, masonry restoration work at the Paul L. Dunbar School has finally begun. The historic academy north of center city serves grades k-8 and the façade was in serious need of repair. Old brick parapets were removed and reconstructed with new reinforced and grouted CMU, the exterior brick wythe was reconstructed as well and new flashing and anchors were installed.

This project shows the importance of masonry investigations, as the existing steel angle lintels were severely deteriorated.

2_SCHRADERGROUP_Paul-Dunbar-Academy_School-District-of-Philadelphia

Community College of Philadelphia – Career and Advanced Technology Center, New Facility

1_SCHRADERGROUP_Community-College-of-Philadelphia_Career-and-Advanced-Technology-Center

In West Philadelphia, the new Career and Advanced Technology Center for the Community College of Philadelphia is coming along nicely. The steel frame is being erected from the ground floor level while footings and foundations are ongoing at the first-floor level.

2_SCHRADERGROUP_Community-College-of-Philadelphia_Career-and-Advanced-Technology-Center

Upper Merion Area School District – Upper Merion Area High School, New Facility

1_SCHRADERGROUP_Upper-Merion-Area-School-District-New-High-School

In King of Prussia, the new high school is taking shape. The structural steel and foundation/underground work is ongoing and concrete slabs are underway.

2_SCHRADERGROUP_Upper-Merion-Area-School-District-New-High-School

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure, New Facility

1_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_RTMC

In King of Prussia, the grading for the RTMC building pad is ongoing. Rebar is on site and concrete footings are being poured. The formwork erection for the southwest retaining wall is recently underway.

2_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_Parking-Garage

The parking structure is progressing quickly. The curtain wall framing at the stairs, the stair railing, electrical conduit, and plumbing piping have all been installed and concrete washes are complete. The roof membrane installation has been recently completed as well.

3_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_Parking-Garage

As the weather improves and work continues, it is exciting to watch these projects come to fruition. We would like to thank all of our clients, consultants, contractors, and supporters for your dedication and support!

Learn more about these and other exciting SCHRADERGROUP projects here!

School District of Springfield Township, Enfield K-2 Early Learning Center Recognized as Outstanding Project in Learning By Design’s Spring 2021 Issue

SCHRADERGROUP (SG) is proud to announce that our recently completed project, the School District of Springfield Township’s Enfield K-2 Early Learning Center, has been recognized as an Outstanding Project in Learning By Design’s Spring 2021 issue.

Each year, Learning By Design showcases the very best in the educational design and construction market. The award-winning magazine is published three times a year and regularly recognizes the nation’s top K-12 and higher education projects and architecture firms.

Exterior-2_SCHRADERGROUP_Learning-By-Design-Spring-2021-Outstanding Project-Enfield-ELC-SDST

SG is excited to have yet another project featured in this prestigious magazine. We have thoroughly enjoyed working with the School District of Springfield Township (SDST) and are honored to have this wonderful facility featured in this issue.

Interior-3_SCHRADERGROUP_School_District_of_Springfield_Township_Enfield_Early_Learning_Center

Faced with a growing population and following studies of potential options, SDST elected to create a new Early Learning Center for grades K-2 for their district. SCHRADERGROUP worked with the District and community to create this 105,000 SF facility nestled into a sloping site with a courtyard in the center. The learning resource center and STEAM program is located at the core of the facility and the evening public-use spaces are to the front. The academic clusters radiate from the learning resource center around the courtyard. Creative configuration of the classroom clusters allows the building to climb the hillside of the site while including a quiet contemplative courtyard nestled into the classroom clusters. The courtyard is designed to enhance outdoor learning opportunities.

Aerial_SCHRADERGROUP_Learning-By-Design-Spring-2021-Outstanding Project-Enfield-ELC-SDST

The exterior material and building masses are residential in character to work with the surrounding neighborhood. Colors, building heights and masses, and rooflines are all carefully calibrated to reduce the scale of the facility from all street views.

You can view the Spring 2021 issue of Learning By Design here.

Learn more about the Enfield K-2 Early Learning Center here. The ribbon cutting ceremony for the new facility will take place later this month!

SG is proud to have partnered with Springfield Township School District. Learn more about this amazing school district here.

SCHRADERGROUP Construction Progress – March 2021

2021 has been off to quite a busy start here at SCHRADERGROUP! The team has been working diligently on multiple projects in both the K-12 and Public Safety markets, including Upper Merion Area High School, Chatham County (NC) Emergency Operations Center, Anne Frank Elementary School, Knapp Elementary School, the East Pennsboro Area School District’s Administration Office, and the PennDOT District 6.0 Regional Traffic Management Center and Parking Structure.

With the weather improving recently, construction progress has been speeding up! See below for details on each of these exciting projects.

Upper Merion Area School District – Upper Merion Area High School

UMASD-IMG_0225

This month, the site finally started to dry out. Structural steel is being erected and the site was buzzing with activity!

Chatham County, North Carolina – Emergency Operations Center (EOC)

Chatham Site Aerial

Early site work has been moving along on this North Carolina EOC project. The pond construction, on-site water, and rough grading over the culvert are all complete while off-site water and road grading remains ongoing.

The School District of Philadelphia – Anne Frank Elementary School

AnneFrank-1_IMG_9020

In Philadelphia, construction continues on the Anne Frank Elementary School. The concrete slabs are completed, and the CMU work is coming close behind. Both interior and exterior metal stud work is in progress.

AnneFrank-2_IMG_9009

North Penn School District – Knapp Elementary School

Knapp-Site

Phase 1 of Knapp Elementary School’s renovations and additions is nearly complete! An 8-classroom addition that includes a new bus entry canopy and vestibule will provide the swing space for the remainder of the renovation work. Demolition is set to start for the next phase, which will create a brand new Dining Commons, Large Group Instruction space, and secure entry.

East Pennsboro Area School District (EPASD) – District Administration Office

EPASD-1_IMG_9067

Up near Harrisburg, the District Administration Office for EPASD is coming along nicely. The exterior steel for the addition is complete and the concrete slab was poured last week. Interior stud work is currently in progress.

EPASD-2_IMG_9078

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure

RTMC-020

Back in Philly, the PennDOT RTMC building is off and running. The first section of retaining wall footing is being constructed and the grading for the building pad is underway.

RTMC-Parking_IMG_3474

The activity at the parking structure is bustling as well. Steel installation at the stair towers is complete and rebar has been installed at the stair landing in preparation for concrete pours. CMU wall installation is underway as well as stud framing, HM door installation, and the sealing of vertical joints.

 

We are so excited to see these designs finally coming to reality! Thank you to our wonderful consultants and partners, particularly Heim Construction, Bala Consulting Engineers and Alfred Benesch & Company in their great work with PennDOT.

Learn more about these and other exciting SCHRADERGROUP projects here!

Council Rock School District’s Rolling Hills Elementary School Completed with LEED Gold Certification + ACE Grant

SCHRADERGROUP (SG) is excited to announce that Council Rock School District’s (CRSD) Rolling Hills Elementary School additions and renovations project is complete. The 12,426 SF addition and 62,695 SF renovation project transformed the facility to support the next generation of learning. The construction phase of this project persevered through the challenges associated with the pandemic through spring and summer of 2020.

Rolling Hills Elementary School is a 75,121 SF single-story elementary school for grades K-6. The existing building floor plan was completely overhauled through to the concrete roof structure to convert the existing old-style open classroom layout to a progressive and functional configuration with natural daylighting.

1-Interior-5_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

The design incorporated energy efficient solutions, including solar panels on the roof, and achieved LEED Gold Certification and an ACE Grant from the Commonwealth of Pennsylvania. The transformation is further exemplified with an identifiable high-volume main entrance that floods the space with natural light. New building façades were constructed with abundant window openings and a variety of exterior finish materials which serve to fragment the horizontality of the one-story classroom wings.

2-Exterior-3_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

Apart from the Multi-Purpose Room which remained in its previous location, the majority of the other spaces were reconfigured within the parameters of the original building footprint. Additions for an expanded and secure administration area, classrooms and stage were added to support the design program. The building also received all new exterior and interior walls, new mechanical, electrical and plumbing systems, and AV/IT infrastructure systems.

SG is proud of our partnership with the Council Rock School District, D’Huy Engineering, and our many great consultants. We look forward to more projects in the future.

Learn more about Council Rock School District here.

Learn more about Council Rock School District’s Rolling Hills Elementary School project, here.

See previously completed K-12 projects, including other Council Rock School District projects here.

3-Interior-4_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School