Category: Projects
SCHRADERGROUP Attends the Enfield Elementary School Ribbon Cutting Ceremony for the School District of Springfield Township
SCHRADERGROUP (SG) recently attended the ribbon cutting ceremony for the new Enfield Elementary School for the School District of Springfield Township (SDST) in Erdenheim, PA on May 21st. The event commemorated the completion of the school district’s newest facility. Enfield Elementary School is a state-of-the-art K-2 Early Learning Center designed to support the school’s unique learning curriculum specifically designed for this young age group.
Several design team members represented the SG team at the event, joining SDST staff, faculty, students, local community members, and D’Huy Engineering Construction Managers, all of whom were gathered to celebrate the new facility’s completion.

The morning’s events began with reflections on the project from former Superintendent Dr. Nancy Hacker and former Principal Dr. Catherine Van Vooren, both of whom were instrumental in formulating the vision and in working with the design team from the early project conception and throughout the design. David Schrader presented Dr. Hacker, the School Board, and the School District of Springfield Township with the Spring 2021 Learning by Design Award for Outstanding Project, further recognizing this achievement.
Current Superintendent Dr. MaryJo Yannacone provided comments and then current Principal Dr. Meghan Markle noted that this new facility will help nurture the students to be “creative, caring and curious” young learners. She then proudly introduced a representative from each Enfield Elementary School grade level to say a few words on what they liked about their school. One young man from first grade remarked that the best thing about the school is that his older sister was jealous that he was able to attend the school and that she couldn’t, followed by the second-grade representative who closed her comments noting the school was “Spectacular!”. The ceremony concluded with the ribbon cutting pictured below to officially dedicate the opening of the school.

Following the ceremony, a library dedication and tree dedication were held, both dedicating plaques to community members involved with the District. An outdoor luncheon finished off the festivities for the day.
SG is honored to be a part of such a significant project for the District. We are grateful to have the opportunity to support the School District of Springfield Township and are proud of this new facility dedicated to the District’s youngest learners.
SG would also like to express our gratitude to the entire team for their contributions to the design and construction of this amazing school. Thank you to D’Huy Engineering, Snyder Hoffman Associates, Renew Design Group, Lobar Inc., Boro Construction, Philips Brothers, and Stan-Roch Plumbing.
Learn more about this exciting project here.
Learn more about the School District of Springfield Township here.
SCHRADERGROUP Construction Progress – March 2021
2021 has been off to quite a busy start here at SCHRADERGROUP! The team has been working diligently on multiple projects in both the K-12 and Public Safety markets, including Upper Merion Area High School, Chatham County (NC) Emergency Operations Center, Anne Frank Elementary School, Knapp Elementary School, the East Pennsboro Area School District’s Administration Office, and the PennDOT District 6.0 Regional Traffic Management Center and Parking Structure.
With the weather improving recently, construction progress has been speeding up! See below for details on each of these exciting projects.
Upper Merion Area School District – Upper Merion Area High School
This month, the site finally started to dry out. Structural steel is being erected and the site was buzzing with activity!
Chatham County, North Carolina – Emergency Operations Center (EOC)
Early site work has been moving along on this North Carolina EOC project. The pond construction, on-site water, and rough grading over the culvert are all complete while off-site water and road grading remains ongoing.
The School District of Philadelphia – Anne Frank Elementary School
In Philadelphia, construction continues on the Anne Frank Elementary School. The concrete slabs are completed, and the CMU work is coming close behind. Both interior and exterior metal stud work is in progress.
North Penn School District – Knapp Elementary School
Phase 1 of Knapp Elementary School’s renovations and additions is nearly complete! An 8-classroom addition that includes a new bus entry canopy and vestibule will provide the swing space for the remainder of the renovation work. Demolition is set to start for the next phase, which will create a brand new Dining Commons, Large Group Instruction space, and secure entry.
East Pennsboro Area School District (EPASD) – District Administration Office
Up near Harrisburg, the District Administration Office for EPASD is coming along nicely. The exterior steel for the addition is complete and the concrete slab was poured last week. Interior stud work is currently in progress.
Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure
Back in Philly, the PennDOT RTMC building is off and running. The first section of retaining wall footing is being constructed and the grading for the building pad is underway.
The activity at the parking structure is bustling as well. Steel installation at the stair towers is complete and rebar has been installed at the stair landing in preparation for concrete pours. CMU wall installation is underway as well as stud framing, HM door installation, and the sealing of vertical joints.
We are so excited to see these designs finally coming to reality! Thank you to our wonderful consultants and partners, particularly Heim Construction, Bala Consulting Engineers and Alfred Benesch & Company in their great work with PennDOT.
Learn more about these and other exciting SCHRADERGROUP projects here!
Hazleton Area School District’s Creative Solutions to Increase Student Capacity
Based on the current enrollments and the rate of new arrivals into the district, and as identified as part of SCHRADERGROUP’s capacity analysis of the District, the District’s Elementary/Middle Schools had reached and were exceeding capacity. To gain a sufficient number of classroom spaces as quickly as possible, SCHRADERGROUP designed and bid multiple building projects to convert existing interior spaces to classrooms. Interior renovations versus new construction not only saved construction costs but also reduced the timeline to occupy the spaces. The completed projects created 30 additional classrooms, increasing the Hazleton Area School District’s (HASD) Capacity to 750 students for grades K-8 for under $6 million dollars.
The two creative solutions to add classroom space was simple – capture underutilized space for the educational program. The first set of renovation projects converted existing pools to classroom spaces at multiple K-8 Schools including Freeland Elementary/Middle School, Heights Terrace Elementary/Middle School, McAdoo-Kelayres Elementary/Middle School and Valley Elementary/Middle School. The added benefit of taking multiple pool facilities off-line was the reduction of on-going maintenance costs to operate the pools year-long.
The second set of renovation projects converted a portion of the library space to a self-contained classroom space with a smaller area for the library functions at some of the elementary and/or middle schools including Drums Elementary/Middle School, Freeland Elementary/Middle School, West Hazleton Elementary/Middle School, Hazel Township Early Learning Center, Hazleton (The Castle) Elementary/Middle School, Maple Manor Elementary/Middle School, Valley Elementary/Middle School and Heights Terrace Elementary/Middle School.
These creative measures to recapture classroom space within the building effectively resolved the capacity needs at the K-8 grade levels for the foreseeable future.
SCHRADERGROUP is grateful for this opportunity and proud to have been part of many building transformations in this community. We look forward to sharing future experiences with HASD!
Learn more about Hazleton Area School District here.
Learn more about SCHRADERGROUP’S work with K-12 facilities here.
Quakertown Community School District’s Neidig Elementary School has been Transformed
Quakertown Community School District’s Neidig Elementary School is one of our best examples of how alterations and additions can transform a 1950s era building into a state-of-the-art learning environment. Originally constructed in 1958, the school opened this fall with a new look, increased capacity to accommodate 600 students to support the District’s enrollment, and spaces designed to enhance the educational program.
The existing classroom wing was renovated to serve the primary grade levels with new cabinetry, finishes and toilet room renovations. A two-story classroom wing expansion for the intermediate grade levels features a centralized large group instruction area on each floor level for interactive and collaborative learning. Building circulation is captured for program space with areas provided for small group instruction and a learning stair at the main entrance lobby adjacent to the expanded administration area. The variety of spaces offer opportunities for student research, development and presentation as part of the next generation of learning.
Building updates in the specials wing of the building includes complete interior renovations to the library, art and music classrooms, as well as the addition of a gymnasium with a stage for physical education and school performances. Other renovations include new HVAC, electrical and plumbing systems, updated technology, a new kitchen, new roof and new windows. In addition to the building improvements, site improvements include improved circulation to separate the parent and bus loops, expanded parking and new play areas.
SCHRADERGROUP is proud to have been a part of this building transformation and contributors to Quakertown Community School District’s vision for excellence in education.
To learn more about Quakertown Community School District, click here.
To learn more about QCSD’s Neidig Elementary School, here.
Recapping 2020: SCHRADERGROUP’S 16TH Year
2020 was quite a year. A year filled with challenges endured by all. We learned to live with new norms and learned how to adjust to dramatic changes not only in the workplace, but in everyday life as well.
But with these challenging times comes a chance to seize opportunities, continue growth and show our commitment to our clients, partners and the community. The SCHRADERGROUP (SG) team is grateful for all of the opportunities and experiences we have been able to participate in the past year (yes, that includes virtually), and would like to take the time to reflect on all that was accomplished in 2020.
While the SG team had participated in many events for this year, we have responded to all social distancing guidelines and appropriate pandemic responses.
The SCHRADERGROUP Team
2020 marks SCHRADERGROUP’s sixteenth anniversary…
SCHRADERGROUP was established on April 15, 2004. Since then, SG has been recognized both regionally and nationally for functional and dynamic design that offers the highest degree of service to the user, responds to and respects both the built and natural environment, and demonstrates inspired aesthetics.
New location…SG started off 2020 by opening a new office location in Raleigh, North Carolina. With existing offices in Philadelphia, Lancaster and Baltimore, SG is now more committed than ever to providing dedicated academic and public safety design to all our long-standing clients across the country, as well as welcoming additional opportunities in the North Carolina region.
Keeping our community safe…
As the COVID-19 pandemic initially caused a severe shortage of personal protective equipment (PPE) back in April, members of the SG team worked with Cornell University in their “Operation PPE” effort to provide protective gear for medical professionals. Sets of 3D printed face visors were paired with laser-cut shields and shipped to Mercy Catholic Medical Center in West Philadelphia.
Community Engagement
SG celebrated project initiations by attending several groundbreaking ceremonies…SG marked the beginning of construction of the Upper Merion Area School District’s (UMASD) new High School project with a Groundbreaking Ceremony. The 345,000 SF new facility connects the existing middle school through the athletic facilities creating a full secondary campus. The project was the result of a community-engaged master planning process and two successful UMASD elementary school projects.
In August, SG attended the Groundbreaking Ceremony for the new Pennsylvania Department of Transportation (PennDOT) District 6-0 Regional Traffic Management Center (RTMC) and Parking Structure project. Designed to achieve a LEED Silver rating, the 2-story, 44,000 SF facility will expand PennDOT’s capabilities and enhance operations. The project is scheduled for completion in September 2022.




In tune with our mission of community involvement, SG participated in the following events…



Presenting to the community…
In November, SCHRADERGROUP participated in two virtual presentations for local school district classes informing students of the architectural processes involved in our projects.
SG Project Manager Dan D’Amico presented to Upper Merion Area School District’s School Board and community a video update on the High School construction project. He then went on to show the presentation to a tech class at the High School, providing students a chance to see the site plan, floor plan and renderings. You can view this presentation here.
Managing Partner David Schrader co-hosted a presentation to a class in Council Rock School District’s High School North in November as well. The presentation focused on green building and was hosted with CRSD Director of Operations Doug Taylor.
SG’s commitment to design and sustainability for the next generation will not cease because of the current pandemic. We plan to continue our dedication to educational facilities and the community that use them into the new year, whether those activities can be done safely in person or virtually.
Conferences + Events
The SG team made exciting new connections at various conferences and events this year…
SCHRADERGROUP attended various virtual conferences this year in lieu of the usual in-person events.
The SG team attended the PASBO Facilities, Transportation & Safety conference this year. This conference looks into three critical areas in school business: Facility Management, Student Transportation and School Safety.
Managing Partner David Schrader and Senior Project Manager Danielle Hoffer, along with Upper Merion Area School District Administrative Team Dr. John Toleno and Jonathan Bauer, hosted a virtual presentation at the Association for Learning Environments (A4LE) Annual Conference in November.
Additionally, SG Principal Harry Pettoni attended the North Carolina Sheriff’s Association Fall meeting in Carteret County, NC in November. The NCSA conference allows sheriffs and deputies to come together to talk about key issues facing law enforcement agencies across the state. The conference followed all CDC guidelines.
Awards + Recognition
SCHRADERGROUP is proud to announce the following awards we have received in 2020…
SG is honored to earn a ranking once again in the Engineering News-Record (ENR) Mid-Atlantic’s Top Design Firms list for 2020. We share this honor with all of our dedicated clients and partners whose continued commitment made this #96 ranking possible. You can view the full list here.

SG is equally proud of the recognition for the following projects this year…
SG celebrated with the Council Rock School District (CRSD), D’Huy Engineering and Breslin Ridyard Fadero Architects at the official presentation of LEED Gold Plaques for CRSD’s Holland Middle School and Newtown Middle School projects. SG designed Holland Middle School while Breslin Ridyard Fadero Architects designed Newtown Middle School. The two teams worked in tandem to design these facilities at the same time in order to create a level of educational parity and similar aesthetics within the two facilities. CRSD, with D’Huy Engineering’s guidance, was able to secure an ACE grant for both projects.

See SG in the news as well!
Looking to 2021 + Beyond
We thank you for all of the experiences we have had during 2020 and are excited for more opportunities in the new year!
Wishing you, your families and loved ones a Happy, Healthy New Year!
From all of us at

Community College of Philadelphia Breaks Ground on New Career and Advanced Technology Center
SCHRADERGROUP (SG) attended the official ceremonial groundbreaking for the Community College of Philadelphia’s new Career and Advanced Technology Center on Wednesday, November 18th. Managing Partner David Schrader represented SG at the event which was also attended by Mayor Jim Kenney and the College’s president, Dr. Donald Generals.
As part of its mission to build a better and brighter future for Philadelphia, the College selected SCHRADERGROUP, in partnership with Lavallee Brensinger Architects, to transform the college’s West Philadelphia Regional Center into a new Career and Advanced Technology Center. The center will provide high-quality academic, career and technical programs for student’s entering the region’s workforce.
The main goal of the project was to create a dynamic, identity-focused center that provides students with programs that concentrate on career readiness and to generate a thriving workforce in Philadelphia’s transportation, manufacturing and healthcare fields.
The new 75,000 SF facility will include state-of-the-art advanced and adaptive technologies for instructional space and study areas as well as laboratory service bays for automobiles, small engine equipment and spaces for diesel technology. Programs offered include transportation and logistics technology training, advanced manufacturing training, entry-level healthcare career training and an innovation hub for small businesses and entrepreneurs.
Other notable features of the facility include LEED certification, energy efficient design utilizing copious amounts of natural daylight, green rooftops for students and community members, a second-floor patio and adjoining room for events, and a learning commons and multiple conference rooms for student collaboration.
The facility is scheduled to open in 2022.
SG is honored to work on this exciting project. To learn more, click here.
To learn more about the Community College of Philadelphia, click here.