Tag: architecture

SCHRADERGROUP Hosts Design Workshop for Great Valley School District for the Conceptualization of a New 5/6 Grade Center

After completing a district-wide facility assessment and master plan for the district in 2020, SCHRADERGROUP (SG) began a series of community workshops to identify priorities and to narrow the field of options for district-wide planning for Great Valley School District (GVSD). Based on the master plan, capacity analysis, and community meetings, the District opted to design a new 5/6 Grade Center on a site adjacent to the existing K.D. Markley Elementary School.

1_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

SCHRADERGROUP’s process includes community input through planning and design workshops. In the case of the new 5/6 Grade Center, SG teamed with GVSD to hold this workshop in the existing K.D. Markley Elementary School on April 21st. SG welcomed over 50 stakeholders to the workshop to hear a review of the process, virtually tour other state-of-the-art facilities, and discuss preferences for the new 5/6 Grade Center.

After a series of consensus building exercises, the team split into smaller groups and each group created multiple options for the new facility using the existing site and programming blocks. The SG team took away some valuable feedback from this process and is very excited to start the designs for the new center.

2_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

Learn more about Great Valley School District here.

See more of SCHRADERGROUP’s work with K-12 schools here.

3_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

SCHRADERGROUP Hosts Design Workshop for Hatboro-Horsham School District to Determine the Future Configuration of the Keith Valley Middle School

2021 has been off to a busy start for Hatboro-Horsham School District (HHSD)! After hosting multiple conceptualization sessions in January and February and taking tours of example facilities throughout the Mid-Atlantic in March, the SCHRADERGROUP (SG) team conducted a planning workshop with HHSD staff, parents, and Hatboro and Horsham municipal officials last month.

The existing Keith Valley Middle School is aging and in need of serious repairs. There are ADA issues throughout the facility and upgrades are needed to the HVAC systems. Through prior studies and through a process conducted by D’Huy Engineering, it was determined that replacing the entire middle school was the most feasible option for the district. So, the next steps were to meet with the community members to design a replacement middle school that can better serve its students as part of a 21st century learning environment.

1_SCHRADERGROUP_Keith-Valley-Middle-School-Design-Workshop_Hatboro-Horsham-School-District

SCHRADERGROUP partnered with HHSD and D’Huy Engineering to host the workshop on April 8th. After an introductory process, the team split into smaller groups. Each group was given site plans and program blocks to brainstorm and envision the different aspects of the new school on the existing site. SG is very excited to take the next steps in creating a dynamic and functional middle school to serve the residents of Hatboro-Horsham School District.

2_SCHRADERGROUP_Keith-Valley-Middle-School-Design-Workshop_Hatboro-Horsham-School-District

Following the completion of the Crooked Billet Elementary School in 2020, this exciting project continues SG’s relationship with Hatboro-Horsham School District and all of the wonderful people who live, work and learn in the district.

Learn more about other SG projects at Hatboro-Horsham School District here.

Learn more about Hatboro-Horsham School District here.

3_SCHRADERGROUP_Keith-Valley-Middle-School-Design-Workshop_Hatboro-Horsham-School-District

SCHRADERGROUP Construction Progress – April 2021

SCHRADERGROUP’S projects are quickly becoming a reality as construction continued throughout April. The team has been hard at work with construction administration for a variety of projects. A few of our construction projects that are underway include: two projects for the School District of Philadelphia, the Community College of Philadelphia’s new Career and Advanced Technology Center, the new Upper Merion Area High School, and the new PennDOT District 6.0 Regional Traffic Management Center and Parking Structure.

School District of Philadelphia – Anne Frank Elementary School, Renovations

1_SCHRADERGROUP_Anne-Frank-Elementary-School_School-District-of-Philadelphia

Construction continues at Anne Frank Elementary School in northeast Philadelphia. Interior and exterior metal studwork and HVAC ductwork continues while exterior brick work is 80% complete. In the existing building, new VCT flooring has been installed.

2_SCHRADERGROUP_Anne-Frank-Elementary-School_School-District-of-Philadelphia

School District of Philadelphia – Paul L. Dunbar Promise Academy, Masonry Investigation

1_SCHRADERGROUP_Paul-Dunbar-Academy_School-District-of-Philadelphia

Moving into Templetown, masonry restoration work at the Paul L. Dunbar School has finally begun. The historic academy north of center city serves grades k-8 and the façade was in serious need of repair. Old brick parapets were removed and reconstructed with new reinforced and grouted CMU, the exterior brick wythe was reconstructed as well and new flashing and anchors were installed.

This project shows the importance of masonry investigations, as the existing steel angle lintels were severely deteriorated.

2_SCHRADERGROUP_Paul-Dunbar-Academy_School-District-of-Philadelphia

Community College of Philadelphia – Career and Advanced Technology Center, New Facility

1_SCHRADERGROUP_Community-College-of-Philadelphia_Career-and-Advanced-Technology-Center

In West Philadelphia, the new Career and Advanced Technology Center for the Community College of Philadelphia is coming along nicely. The steel frame is being erected from the ground floor level while footings and foundations are ongoing at the first-floor level.

2_SCHRADERGROUP_Community-College-of-Philadelphia_Career-and-Advanced-Technology-Center

Upper Merion Area School District – Upper Merion Area High School, New Facility

1_SCHRADERGROUP_Upper-Merion-Area-School-District-New-High-School

In King of Prussia, the new high school is taking shape. The structural steel and foundation/underground work is ongoing and concrete slabs are underway.

2_SCHRADERGROUP_Upper-Merion-Area-School-District-New-High-School

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure, New Facility

1_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_RTMC

In King of Prussia, the grading for the RTMC building pad is ongoing. Rebar is on site and concrete footings are being poured. The formwork erection for the southwest retaining wall is recently underway.

2_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_Parking-Garage

The parking structure is progressing quickly. The curtain wall framing at the stairs, the stair railing, electrical conduit, and plumbing piping have all been installed and concrete washes are complete. The roof membrane installation has been recently completed as well.

3_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_Parking-Garage

As the weather improves and work continues, it is exciting to watch these projects come to fruition. We would like to thank all of our clients, consultants, contractors, and supporters for your dedication and support!

Learn more about these and other exciting SCHRADERGROUP projects here!

School District of Springfield Township, Enfield K-2 Early Learning Center Recognized as Outstanding Project in Learning By Design’s Spring 2021 Issue

SCHRADERGROUP (SG) is proud to announce that our recently completed project, the School District of Springfield Township’s Enfield K-2 Early Learning Center, has been recognized as an Outstanding Project in Learning By Design’s Spring 2021 issue.

Each year, Learning By Design showcases the very best in the educational design and construction market. The award-winning magazine is published three times a year and regularly recognizes the nation’s top K-12 and higher education projects and architecture firms.

Exterior-2_SCHRADERGROUP_Learning-By-Design-Spring-2021-Outstanding Project-Enfield-ELC-SDST

SG is excited to have yet another project featured in this prestigious magazine. We have thoroughly enjoyed working with the School District of Springfield Township (SDST) and are honored to have this wonderful facility featured in this issue.

Interior-3_SCHRADERGROUP_School_District_of_Springfield_Township_Enfield_Early_Learning_Center

Faced with a growing population and following studies of potential options, SDST elected to create a new Early Learning Center for grades K-2 for their district. SCHRADERGROUP worked with the District and community to create this 105,000 SF facility nestled into a sloping site with a courtyard in the center. The learning resource center and STEAM program is located at the core of the facility and the evening public-use spaces are to the front. The academic clusters radiate from the learning resource center around the courtyard. Creative configuration of the classroom clusters allows the building to climb the hillside of the site while including a quiet contemplative courtyard nestled into the classroom clusters. The courtyard is designed to enhance outdoor learning opportunities.

Aerial_SCHRADERGROUP_Learning-By-Design-Spring-2021-Outstanding Project-Enfield-ELC-SDST

The exterior material and building masses are residential in character to work with the surrounding neighborhood. Colors, building heights and masses, and rooflines are all carefully calibrated to reduce the scale of the facility from all street views.

You can view the Spring 2021 issue of Learning By Design here.

Learn more about the Enfield K-2 Early Learning Center here. The ribbon cutting ceremony for the new facility will take place later this month!

SG is proud to have partnered with Springfield Township School District. Learn more about this amazing school district here.

Council Rock School District’s Rolling Hills Elementary School Completed with LEED Gold Certification + ACE Grant

SCHRADERGROUP (SG) is excited to announce that Council Rock School District’s (CRSD) Rolling Hills Elementary School additions and renovations project is complete. The 12,426 SF addition and 62,695 SF renovation project transformed the facility to support the next generation of learning. The construction phase of this project persevered through the challenges associated with the pandemic through spring and summer of 2020.

Rolling Hills Elementary School is a 75,121 SF single-story elementary school for grades K-6. The existing building floor plan was completely overhauled through to the concrete roof structure to convert the existing old-style open classroom layout to a progressive and functional configuration with natural daylighting.

1-Interior-5_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

The design incorporated energy efficient solutions, including solar panels on the roof, and achieved LEED Gold Certification and an ACE Grant from the Commonwealth of Pennsylvania. The transformation is further exemplified with an identifiable high-volume main entrance that floods the space with natural light. New building façades were constructed with abundant window openings and a variety of exterior finish materials which serve to fragment the horizontality of the one-story classroom wings.

2-Exterior-3_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

Apart from the Multi-Purpose Room which remained in its previous location, the majority of the other spaces were reconfigured within the parameters of the original building footprint. Additions for an expanded and secure administration area, classrooms and stage were added to support the design program. The building also received all new exterior and interior walls, new mechanical, electrical and plumbing systems, and AV/IT infrastructure systems.

SG is proud of our partnership with the Council Rock School District, D’Huy Engineering, and our many great consultants. We look forward to more projects in the future.

Learn more about Council Rock School District here.

Learn more about Council Rock School District’s Rolling Hills Elementary School project, here.

See previously completed K-12 projects, including other Council Rock School District projects here.

3-Interior-4_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

Hazleton Area School District’s Creative Solutions to Increase Student Capacity

Based on the current enrollments and the rate of new arrivals into the district, and as identified as part of SCHRADERGROUP’s capacity analysis of the District, the District’s Elementary/Middle Schools had reached and were exceeding capacity. To gain a sufficient number of classroom spaces as quickly as possible, SCHRADERGROUP designed and bid multiple building projects to convert existing interior spaces to classrooms. Interior renovations versus new construction not only saved construction costs but also reduced the timeline to occupy the spaces. The completed projects created 30 additional classrooms, increasing the Hazleton Area School District’s (HASD) Capacity to 750 students for grades K-8 for under $6 million dollars.

The two creative solutions to add classroom space was simple – capture underutilized space for the educational program. The first set of renovation projects converted existing pools to classroom spaces at multiple K-8 Schools including Freeland Elementary/Middle School, Heights Terrace Elementary/Middle School, McAdoo-Kelayres Elementary/Middle School and Valley Elementary/Middle School. The added benefit of taking multiple pool facilities off-line was the reduction of on-going maintenance costs to operate the pools year-long.

The second set of renovation projects converted a portion of the library space to a self-contained classroom space with a smaller area for the library functions at some of the elementary and/or middle schools including Drums Elementary/Middle School, Freeland Elementary/Middle School, West Hazleton Elementary/Middle School, Hazel Township Early Learning Center, Hazleton (The Castle) Elementary/Middle School, Maple Manor Elementary/Middle School, Valley Elementary/Middle School and Heights Terrace Elementary/Middle School.

These creative measures to recapture classroom space within the building effectively resolved the capacity needs at the K-8 grade levels for the foreseeable future.

SCHRADERGROUP is grateful for this opportunity and proud to have been part of many building transformations in this community. We look forward to sharing future experiences with HASD!

Learn more about Hazleton Area School District here.

Learn more about SCHRADERGROUP’S work with K-12 facilities here.

SCHRADERGROUP to Attend Virtual 2021 PASBO Conference

SCHRADERGROUP (SG) will be attending the 66th Annual Pennsylvania Association of School Business Officials (PASBO) Conference on March 17th, 19th, 23rd and 25th this month! SG team members will be at the SCHRADERGROUP Virtual Booth from 10am – 1pm on Wednesday the 17th, Friday the 19th, and Tuesday the 23rd, as well as from 10am-noon on Thursday the 25th. We welcome you to stop by and meet the team!

SG is proud to be a Gold Level Sponsor of this prestigious event devoted to the common goal of supporting classroom learning in school through smart business practices. Each year, PASBO provides an opportunity for school business officials to listen to keynote speaker presentations and attend information workshops that provide members with the opportunity to network with their peers. PASBO provides its members with the education, training, and professional development, as well as the timely access to legislative and policy news, needed in order to support this goal of developing and supporting leaders in school business operations.

Although the event is virtual this year, the SG team looks forward to seeing some familiar faces and meeting some new ones! Come visit us at our booth!

Learn more about registering for the PASBO conference here.

Learn more about SCHRADERGROUP’s dedication to educational facilities here.

Sponsorlogo21

SCHRADERGROUP Ranked in Architectural Record’s Top 300 Architecture Firms of 2020

SCHRADERGROUP (SG) is proud to have been ranked #274 in Architectural Record’s Top 300 U.S. Architecture Firms of 2020.

Architectural Record is a monthly publication dedicated to architecture and interior design. Their yearly Top 300 lists are ranked by revenue for architectural services performed in 2019.

This is the first year SG has made this prestigious list, and we look forward to moving up in the rankings in the future!

Learn more about SG’s projects here.

View Architectural Record’s Top 300 U.S. Architecture Firms of 2020 here.

Springfield School District’s New Springfield High School Project Approaches Completion

Springfield School District’s new Springfield High School is nearing completion. Constructed on the southeast corner of an existing 25-acre campus, the goal of the new high school is to provide the school district with a complex that will serve the community for the next 50 years.

2-Interior-5_SCHRADERGROUP_Springfield_School_District_High_School

SCHRADERGROUP (SG), in association with Perkins&Will, provided programming, planning, and design services for the new high school complex anticipated to encompass approximately 195,000 SF. The school will immediately serve over 1,200 students and can be expandable to accommodate approximately 1,450.

3-Exterior-2_SCHRADERGROUP_Springfield_School_District_High_School

Keeping in tune with the SG mission of creating next generation learning environments, the new high school will employ an Academy Model to provide offerings in Art, Business, STE(A)M (Science, Technology, Engineering and Math), Humanities and Liberal Arts.

4-Interior-6_SCHRADERGROUP_Springfield_School_District_High_School

Beyond the high school facility, the project includes the design and construction of new site amenities, including athletic fields, parking, and a stadium complex. The project also includes demolition of the existing high school, District Administration Office Space, and all related structures.

5-Springfield School District High School Track_SCHRADERGROUP

The SG team is pleased to partner with SSD on this highly anticipated educational facility. To learn more about Springfield School District, click here.

This project is being completed in association with Perkins&Will. To learn more about Perkins&Will, click here.

To learn more about the New Springfield High School project, click here.

6-Springfield School District High School_SCHRADERGROUP

SCHRADERGROUP Ranked in Building Design+Construction Magazine’s 2020 Giants 400 Report

SCHRADERGROUP (SG) is proud to have been ranked in nine categories in Building Design+Construction Magazine’s 2020 Giants 400 Report. Most notably, SG has ranked in the top 100 firms for six categories: Top Architecture/Engineering Firms, Schools, Public Safety, Sports Facilities, University Facilities and Local Government Buildings.

The BD+C 2020 Giants 400 Report ranks the nation’s largest architecture and engineering firms in commercial construction, by revenue and market segment. More than 480 architecture, engineering and construction firms participated in this year’s annual report with 130 rankings across 25 building sectors and specialty categories.

SCHRADERGROUP ranked #85 in the Top Architecture/ Engineering Firms category, #49 in Schools (PK-12, public, private, charter, military), #46 in Public Safety/ Justice Facilities, #89 in Sports Facilities/ Stadiums/ Recreational Facilities, #91 in University/ College Facilities and #89 in Local Government Buildings.

Learn more about SG’s projects here.

View the BD+C 2020 Giants 400 Report here.