SCHRADERGROUP Construction Progress – Summer 2021

As we move into the middle of summer, many of our construction projects are now really starting to take shape. A few of the construction projects underway include the new Upper Merion Area High School, additions and renovations to Anne Frank Elementary School for the School District of Philadelphia, the new Career and Advanced Technology Center for the Community College of Philadelphia, the masonry restoration of the Paul L. Dunbar School in Philadelphia, the demolition of the existing Springfield High School, and the PennDOT District 6.0 Regional Traffic Management Center, among others.

Upper Merion Area School District – Upper Merion Area High School, New Facility1-Upper-Merion_Area-High-School_SCHRADERGROUP_May-Construction-Progress

Construction on the new Upper Merion Area High School continues into the heat of the summer. Infrastructure is being installed and is on pace for a September 2022 completion, just in time for Upper Merion Area School District high school students to start their new school year. Upon completion of and move into the new facility, demolition of the existing facility will begin. Once that demolition is complete, new playing fields will be constructed in its place.

2-Upper-Merion_Area-High-School_SCHRADERGROUP_May-Construction-Progress

This month, large Glulam Beams continue to be erected in the common areas. In the theater wing, the steel is in place for the stage as the auditorium takes shape.

3-Upper-Merion_Area-High-School_SCHRADERGROUP_May-Construction-Progress

School District of Philadelphia – Anne Frank Elementary School, Additions and Renovations1-Anne-Frank-Elementary-School_SCHRADERGROUP_May-Construction-Progress

Work on the Anne Frank Elementary School continues in Northeast Philadelphia. Metal panels have been installed on 75% of the new construction areas while the glass and glazing installation is 50% complete.

2-Anne-Frank-Elementary-School_SCHRADERGROUP_May-Construction-Progress

Acoustic ceiling tile and vinyl composite tile installation continues while the walls are being painted. Ceramic tile flooring has started in the toilet rooms as well. A new feature this month are the railings being installed in the new stairways.

3-Anne-Frank-Elementary-School_SCHRADERGROUP_May-Construction-Progress

Community College of Philadelphia – Career and Advanced Technology Center, New Facility1-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

The Community College of Philadelphia’s new Career and Advanced Technology Center (CATC) is progressing in West Philadelphia. Mechanical, Electrical and Plumbing rough-ins continue at the interior wall and ceiling level and fire protection systems will follow.

2-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

Masonry work continues as well as exterior and interior metal framing. The building enclosure systems are expected to be completed by end of summer or early fall.

3-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

Recently, the on-grade concrete slabs were completed on the first floor. This project is scheduled for a February 2022 completion.

4-Community-College-of-Philadelphia_Career-Advanced-Technoloy-Center_SCHRADERGROUP_May-Construction-Progress

School District of Philadelphia – Paul L. Dunbar School, Restoration1-Paul-L-Dunbar-School-SDP_SCHRADERGROUP_May-Construction-Progress

Another School District of Philadelphia school project that is wrapping up is the restoration to the Paul L. Dunbar School. The outdated building exterior was in poor shape, with deteriorated masonry around the parapet of the building.

2-Paul-L-Dunbar-School-SDP_SCHRADERGROUP_May-Construction-Progress

The restoration includes the installation of galvanized steel inlets to replace the rusted ungalvanized ones, the rebuilding of masonry, and the repointing of mortar joints. The project is a restoration of a beautiful WPA funded school. Substantial completion is expected by end of summer.

 

Springfield School District – Springfield High School, Existing High School Demolition and Visitor Side Bleacher Construction1-Springfield-High-School-Demolition_SCHRADERGROUP_May-Construction-Progress

In Springfield, PA, the new Springfield High School has just been completed. Demolition of the existing High School has begun and is on schedule for completion at the end of the summer.

2-Springfield-High-School-Bleacher_SCHRADERGROUP_May-Construction-Progress

The Visitor Side Bleacher building footing and foundations have recently been completed. Next up are the masonry walls and door frames as well as site work grading for the athletic fields and tennis courts.

 

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure, New Facilities1-PennDOT-District-6.0-Regional-Traffic-Management-Center-RTMC_SCHRADERGROUP_May-Construction-Progress

The new PennDOT Regional Traffic Management Center in King of Prussia is progressing nicely, with the continued forming of concrete footings and foundation walls. SG serves as the design component of the Heim Construction Design-Build team for this project. At the accompanying parking garage, work has been completed.

 

It is always exciting to watch our design work become reality! We would like to thank our clients, consultants, contractors, and all other team members for your dedication and support of the on-going efforts for these projects!

Learn more about these and other exciting SCHRADERGROUP projects here!

SCHRADERGROUP Hosts Planning Workshop for Rose Tree Media School District’s New Elementary School

At SCHRADERGROUP, we believe academic design truly is the design for the future, as it provides the environment in which today’s students develop into tomorrow’s thinkers and leaders. In order to keep that goal in focus, we strive to develop designs for facilities created by the community, for the community.

Our community-based workshop process for planning and design inspires innovative design solutions that nest serve our client’s needs. Collaboration is key to supporting our client’s dreams and our team’s capabilities assist with getting to the end result. Educational facility design that is initiated by the client results in a project that will serve the community and is grounded in the district’s culture and educational philosophy. As 2021 continues, more projects are becoming realties for SG and our clients. One of these exciting projects is a new elementary school for Rose Tree Media School District (RTMSD) in Media, PA.

1_SCHRADERGROUP_Rose-Tree-Media-School-District_Design-Workshop_New-Elementary-School

SG recently partnered with RTMSD and ICS to host a planning workshop for faculty and administration of RTMSD to learn what priorities the District has for the new facility. SCHRADERGROUP team members led the process geared towards discovering different options for the new school.

The workshop began with a presentation about next generation learning and gave attendees virtual tours of state-of-the-art facilities in the country that exemplify these ideas. Next, the group broke into smaller teams and held individual visioning and building workshops with feedback loops in order to come up with and vote on the best options for the District.

2_SCHRADERGROUP_Rose-Tree-Media-School-District_Design-Workshop_New-Elementary-School

The SG team came away from this workshop event with multiple site concepts and building plans that were reported back to the larger group. From here, designs will continue with refinement workshops until a final design has been reached.

3_SCHRADERGROUP_Rose-Tree-Media-School-District_Design-Workshop_New-Elementary-School

SG is proud to work with Rose Tree Media School District and is looking forward to completing a state-of-the-art facility for the residents of the district’s municipalities.

To learn more about Rose Tree Media School District, click here.

To learn more about the new elementary school for Rose Tree Media School District, click here.

To learn more about ICS, click here.

To learn more about SCHRADERGROUP’s devotion to creating next generation learning environments, click here.

SCHRADERGROUP Hosts Design Workshop for Great Valley School District for the Conceptualization of a New 5/6 Grade Center

After completing a district-wide facility assessment and master plan for the district in 2020, SCHRADERGROUP (SG) began a series of community workshops to identify priorities and to narrow the field of options for district-wide planning for Great Valley School District (GVSD). Based on the master plan, capacity analysis, and community meetings, the District opted to design a new 5/6 Grade Center on a site adjacent to the existing K.D. Markley Elementary School.

1_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

SCHRADERGROUP’s process includes community input through planning and design workshops. In the case of the new 5/6 Grade Center, SG teamed with GVSD to hold this workshop in the existing K.D. Markley Elementary School on April 21st. SG welcomed over 50 stakeholders to the workshop to hear a review of the process, virtually tour other state-of-the-art facilities, and discuss preferences for the new 5/6 Grade Center.

After a series of consensus building exercises, the team split into smaller groups and each group created multiple options for the new facility using the existing site and programming blocks. The SG team took away some valuable feedback from this process and is very excited to start the designs for the new center.

2_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

Learn more about Great Valley School District here.

See more of SCHRADERGROUP’s work with K-12 schools here.

3_SCHRADERGROUP_Great-Valley-School-District-Design-Workshop_New-5-6-Grade-Center

SCHRADERGROUP Construction Progress – April 2021

SCHRADERGROUP’S projects are quickly becoming a reality as construction continued throughout April. The team has been hard at work with construction administration for a variety of projects. A few of our construction projects that are underway include: two projects for the School District of Philadelphia, the Community College of Philadelphia’s new Career and Advanced Technology Center, the new Upper Merion Area High School, and the new PennDOT District 6.0 Regional Traffic Management Center and Parking Structure.

School District of Philadelphia – Anne Frank Elementary School, Renovations

1_SCHRADERGROUP_Anne-Frank-Elementary-School_School-District-of-Philadelphia

Construction continues at Anne Frank Elementary School in northeast Philadelphia. Interior and exterior metal studwork and HVAC ductwork continues while exterior brick work is 80% complete. In the existing building, new VCT flooring has been installed.

2_SCHRADERGROUP_Anne-Frank-Elementary-School_School-District-of-Philadelphia

School District of Philadelphia – Paul L. Dunbar Promise Academy, Masonry Investigation

1_SCHRADERGROUP_Paul-Dunbar-Academy_School-District-of-Philadelphia

Moving into Templetown, masonry restoration work at the Paul L. Dunbar School has finally begun. The historic academy north of center city serves grades k-8 and the façade was in serious need of repair. Old brick parapets were removed and reconstructed with new reinforced and grouted CMU, the exterior brick wythe was reconstructed as well and new flashing and anchors were installed.

This project shows the importance of masonry investigations, as the existing steel angle lintels were severely deteriorated.

2_SCHRADERGROUP_Paul-Dunbar-Academy_School-District-of-Philadelphia

Community College of Philadelphia – Career and Advanced Technology Center, New Facility

1_SCHRADERGROUP_Community-College-of-Philadelphia_Career-and-Advanced-Technology-Center

In West Philadelphia, the new Career and Advanced Technology Center for the Community College of Philadelphia is coming along nicely. The steel frame is being erected from the ground floor level while footings and foundations are ongoing at the first-floor level.

2_SCHRADERGROUP_Community-College-of-Philadelphia_Career-and-Advanced-Technology-Center

Upper Merion Area School District – Upper Merion Area High School, New Facility

1_SCHRADERGROUP_Upper-Merion-Area-School-District-New-High-School

In King of Prussia, the new high school is taking shape. The structural steel and foundation/underground work is ongoing and concrete slabs are underway.

2_SCHRADERGROUP_Upper-Merion-Area-School-District-New-High-School

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure, New Facility

1_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_RTMC

In King of Prussia, the grading for the RTMC building pad is ongoing. Rebar is on site and concrete footings are being poured. The formwork erection for the southwest retaining wall is recently underway.

2_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_Parking-Garage

The parking structure is progressing quickly. The curtain wall framing at the stairs, the stair railing, electrical conduit, and plumbing piping have all been installed and concrete washes are complete. The roof membrane installation has been recently completed as well.

3_SCHRADERGROUP_PennDOT_Regional-Traffic-Management-Center_Parking-Garage

As the weather improves and work continues, it is exciting to watch these projects come to fruition. We would like to thank all of our clients, consultants, contractors, and supporters for your dedication and support!

Learn more about these and other exciting SCHRADERGROUP projects here!

SCHRADERGROUP Construction Progress – March 2021

2021 has been off to quite a busy start here at SCHRADERGROUP! The team has been working diligently on multiple projects in both the K-12 and Public Safety markets, including Upper Merion Area High School, Chatham County (NC) Emergency Operations Center, Anne Frank Elementary School, Knapp Elementary School, the East Pennsboro Area School District’s Administration Office, and the PennDOT District 6.0 Regional Traffic Management Center and Parking Structure.

With the weather improving recently, construction progress has been speeding up! See below for details on each of these exciting projects.

Upper Merion Area School District – Upper Merion Area High School

UMASD-IMG_0225

This month, the site finally started to dry out. Structural steel is being erected and the site was buzzing with activity!

Chatham County, North Carolina – Emergency Operations Center (EOC)

Chatham Site Aerial

Early site work has been moving along on this North Carolina EOC project. The pond construction, on-site water, and rough grading over the culvert are all complete while off-site water and road grading remains ongoing.

The School District of Philadelphia – Anne Frank Elementary School

AnneFrank-1_IMG_9020

In Philadelphia, construction continues on the Anne Frank Elementary School. The concrete slabs are completed, and the CMU work is coming close behind. Both interior and exterior metal stud work is in progress.

AnneFrank-2_IMG_9009

North Penn School District – Knapp Elementary School

Knapp-Site

Phase 1 of Knapp Elementary School’s renovations and additions is nearly complete! An 8-classroom addition that includes a new bus entry canopy and vestibule will provide the swing space for the remainder of the renovation work. Demolition is set to start for the next phase, which will create a brand new Dining Commons, Large Group Instruction space, and secure entry.

East Pennsboro Area School District (EPASD) – District Administration Office

EPASD-1_IMG_9067

Up near Harrisburg, the District Administration Office for EPASD is coming along nicely. The exterior steel for the addition is complete and the concrete slab was poured last week. Interior stud work is currently in progress.

EPASD-2_IMG_9078

Department of General Services – PennDOT District 6.0 Regional Traffic Management Center (RTMC) and Parking Structure

RTMC-020

Back in Philly, the PennDOT RTMC building is off and running. The first section of retaining wall footing is being constructed and the grading for the building pad is underway.

RTMC-Parking_IMG_3474

The activity at the parking structure is bustling as well. Steel installation at the stair towers is complete and rebar has been installed at the stair landing in preparation for concrete pours. CMU wall installation is underway as well as stud framing, HM door installation, and the sealing of vertical joints.

 

We are so excited to see these designs finally coming to reality! Thank you to our wonderful consultants and partners, particularly Heim Construction, Bala Consulting Engineers and Alfred Benesch & Company in their great work with PennDOT.

Learn more about these and other exciting SCHRADERGROUP projects here!

Council Rock School District’s Rolling Hills Elementary School Completed with LEED Gold Certification + ACE Grant

SCHRADERGROUP (SG) is excited to announce that Council Rock School District’s (CRSD) Rolling Hills Elementary School additions and renovations project is complete. The 12,426 SF addition and 62,695 SF renovation project transformed the facility to support the next generation of learning. The construction phase of this project persevered through the challenges associated with the pandemic through spring and summer of 2020.

Rolling Hills Elementary School is a 75,121 SF single-story elementary school for grades K-6. The existing building floor plan was completely overhauled through to the concrete roof structure to convert the existing old-style open classroom layout to a progressive and functional configuration with natural daylighting.

1-Interior-5_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

The design incorporated energy efficient solutions, including solar panels on the roof, and achieved LEED Gold Certification and an ACE Grant from the Commonwealth of Pennsylvania. The transformation is further exemplified with an identifiable high-volume main entrance that floods the space with natural light. New building façades were constructed with abundant window openings and a variety of exterior finish materials which serve to fragment the horizontality of the one-story classroom wings.

2-Exterior-3_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

Apart from the Multi-Purpose Room which remained in its previous location, the majority of the other spaces were reconfigured within the parameters of the original building footprint. Additions for an expanded and secure administration area, classrooms and stage were added to support the design program. The building also received all new exterior and interior walls, new mechanical, electrical and plumbing systems, and AV/IT infrastructure systems.

SG is proud of our partnership with the Council Rock School District, D’Huy Engineering, and our many great consultants. We look forward to more projects in the future.

Learn more about Council Rock School District here.

Learn more about Council Rock School District’s Rolling Hills Elementary School project, here.

See previously completed K-12 projects, including other Council Rock School District projects here.

3-Interior-4_SCHRADERGROUP_Council_Rock_School_District_Rolling_Hillls_Elementary_School

Hazleton Area School District’s Creative Solutions to Increase Student Capacity

Based on the current enrollments and the rate of new arrivals into the district, and as identified as part of SCHRADERGROUP’s capacity analysis of the District, the District’s Elementary/Middle Schools had reached and were exceeding capacity. To gain a sufficient number of classroom spaces as quickly as possible, SCHRADERGROUP designed and bid multiple building projects to convert existing interior spaces to classrooms. Interior renovations versus new construction not only saved construction costs but also reduced the timeline to occupy the spaces. The completed projects created 30 additional classrooms, increasing the Hazleton Area School District’s (HASD) Capacity to 750 students for grades K-8 for under $6 million dollars.

The two creative solutions to add classroom space was simple – capture underutilized space for the educational program. The first set of renovation projects converted existing pools to classroom spaces at multiple K-8 Schools including Freeland Elementary/Middle School, Heights Terrace Elementary/Middle School, McAdoo-Kelayres Elementary/Middle School and Valley Elementary/Middle School. The added benefit of taking multiple pool facilities off-line was the reduction of on-going maintenance costs to operate the pools year-long.

The second set of renovation projects converted a portion of the library space to a self-contained classroom space with a smaller area for the library functions at some of the elementary and/or middle schools including Drums Elementary/Middle School, Freeland Elementary/Middle School, West Hazleton Elementary/Middle School, Hazel Township Early Learning Center, Hazleton (The Castle) Elementary/Middle School, Maple Manor Elementary/Middle School, Valley Elementary/Middle School and Heights Terrace Elementary/Middle School.

These creative measures to recapture classroom space within the building effectively resolved the capacity needs at the K-8 grade levels for the foreseeable future.

SCHRADERGROUP is grateful for this opportunity and proud to have been part of many building transformations in this community. We look forward to sharing future experiences with HASD!

Learn more about Hazleton Area School District here.

Learn more about SCHRADERGROUP’S work with K-12 facilities here.

Quakertown Community School District’s Neidig Elementary School has been Transformed

Quakertown Community School District’s Neidig Elementary School is one of our best examples of how alterations and additions can transform a 1950s era building into a state-of-the-art learning environment. Originally constructed in 1958, the school opened this fall with a new look, increased capacity to accommodate 600 students to support the District’s enrollment, and spaces designed to enhance the educational program.

1-Exterior_SCHRADERGROUP_Quakertown_Community_School_District_Neidig_Elementary_School - Copy

The existing classroom wing was renovated to serve the primary grade levels with new cabinetry, finishes and toilet room renovations. A two-story classroom wing expansion for the intermediate grade levels features a centralized large group instruction area on each floor level for interactive and collaborative learning. Building circulation is captured for program space with areas provided for small group instruction and a learning stair at the main entrance lobby adjacent to the expanded administration area. The variety of spaces offer opportunities for student research, development and presentation as part of the next generation of learning.

2-Interior_SCHRADERGROUP_Quakertown_Community_School_District_Neidig_Elementary_School.jpg

Building updates in the specials wing of the building includes complete interior renovations to the library, art and music classrooms, as well as the addition of a gymnasium with a stage for physical education and school performances. Other renovations include new HVAC, electrical and plumbing systems, updated technology, a new kitchen, new roof and new windows. In addition to the building improvements, site improvements include improved circulation to separate the parent and bus loops, expanded parking and new play areas.

3-Exterior_SCHRADERGROUP_Quakertown_Community_School_District_Neidig_Elementary_School.jpg

SCHRADERGROUP is proud to have been a part of this building transformation and contributors to Quakertown Community School District’s vision for excellence in education.

To learn more about Quakertown Community School District, click here.

To learn more about QCSD’s Neidig Elementary School, here.

Hatboro-Horsham School District’s New Crooked Billet Elementary School Will Soon be Ready for Students

We are excited to announce that one of our new elementary schools is expected to be completed in early October 2020 and ready for students. Hatboro-Horsham School District’s (HHSD) 110,000 SF Crooked Billet Elementary School is the District’s most recent accomplishment in upgrading its aging facilities and is another symbol of rebirth in the community surrounding it. The new K-5 facility replaced the original 1950s elementary school on the same site and will accommodate a larger population of 600 students.

Important to the district and community was the preservation of the history of the site. The Battle of Crooked Billet landmark proudly displayed in front of the school anchors the primary entrance to the building. Adjacent to the main administration entrance, a two-story rotunda serves as an interactive learning space featuring the history of Crooked Billet. The rotunda is centrally located between the curricular areas for Science, Technology, Engineering, Arts and Math (STEAM) program including the STEAM classroom, Media Center, TV Studio and Art classroom. This central core of the building also serves as the transitional area between the public spaces such as the gymnasium and cafeteria, and the academic two-story classroom wing.

The classroom wing showcases an innovative academic layout. Four grade level classrooms are clustered together with each pair of classrooms sharing a small group instruction area. The grade level cluster is directly adjacent to a central large group instruction area where the entire grade level can gather. Each cluster is designed with its own unique color providing grade level identity and wayfinding. Student cubbies are located in the corridors to maximize classroom efficiency.

SCHRADERGROUP is grateful for this opportunity to team with HHSD for the design of Crooked Billet Elementary School. This successful collaborative experience has truly been a team effort resulting in a school that will serve the community for generations.

Learn more about Crooked Billet Elementary School here.

Gulph Elementary School Receives Outstanding Design Recognition from American School & University’s 2019 Educational Interiors Showcase August Issue

SCHRADERGROUP (SG)’s Gulph Elementary School project has been recognized as an Outstanding Design by the American School & University (AS&U)’s 2019 Educational Interiors Showcase, August Issue.

The nation’s school and university administrators, as well as education architects, turn to American School & University for how-to features, insight, industry exclusive reports and research on the planning, design, construction, retrofit, operations, maintenance, security and management of education facilities. AS&U’s mission is to continue serving as the voice of the industry – not just reporting events, but also helping to shape the rapidly growing and evolving education facilities and business market. AS&U delivers important insight to today’s decision makers” (AS&U’s official site).

The recognition highlights Gulph’s new technology center showcasing photos of the learning resource center, STE(A)M maker space, art and music instruction areas, and a “learning stair” intended for large group activities proximate to the classrooms. The classroom wings are structured as groupings of grade-appropriate classrooms with learning support, faculty spaces, and team work areas. Each set of grade clusters is oriented around the two-story media center and STE(A)M Center, connecting through the learning stair, which doubles as a mini presentation space for the building.

SG is pleased to receive recognition again from AS&U.

View the Digital Issue featuring Gulph Elementary here.

Learn more about Gulph Elementary here.