Category: Projects

Quakertown Community School District’s Neidig Elementary School has been Transformed

Quakertown Community School District’s Neidig Elementary School is one of our best examples of how alterations and additions can transform a 1950s era building into a state-of-the-art learning environment. Originally constructed in 1958, the school opened this fall with a new look, increased capacity to accommodate 600 students to support the District’s enrollment, and spaces designed to enhance the educational program.

1-Exterior_SCHRADERGROUP_Quakertown_Community_School_District_Neidig_Elementary_School - Copy

The existing classroom wing was renovated to serve the primary grade levels with new cabinetry, finishes and toilet room renovations. A two-story classroom wing expansion for the intermediate grade levels features a centralized large group instruction area on each floor level for interactive and collaborative learning. Building circulation is captured for program space with areas provided for small group instruction and a learning stair at the main entrance lobby adjacent to the expanded administration area. The variety of spaces offer opportunities for student research, development and presentation as part of the next generation of learning.

2-Interior_SCHRADERGROUP_Quakertown_Community_School_District_Neidig_Elementary_School.jpg

Building updates in the specials wing of the building includes complete interior renovations to the library, art and music classrooms, as well as the addition of a gymnasium with a stage for physical education and school performances. Other renovations include new HVAC, electrical and plumbing systems, updated technology, a new kitchen, new roof and new windows. In addition to the building improvements, site improvements include improved circulation to separate the parent and bus loops, expanded parking and new play areas.

3-Exterior_SCHRADERGROUP_Quakertown_Community_School_District_Neidig_Elementary_School.jpg

SCHRADERGROUP is proud to have been a part of this building transformation and contributors to Quakertown Community School District’s vision for excellence in education.

To learn more about Quakertown Community School District, click here.

To learn more about QCSD’s Neidig Elementary School, here.

Recapping 2020: SCHRADERGROUP’S 16TH Year

2020 was quite a year. A year filled with challenges endured by all. We learned to live with new norms and learned how to adjust to dramatic changes not only in the workplace, but in everyday life as well.

But with these challenging times comes a chance to seize opportunities, continue growth and show our commitment to our clients, partners and the community. The SCHRADERGROUP (SG) team is grateful for all of the opportunities and experiences we have been able to participate in the past year (yes, that includes virtually), and would like to take the time to reflect on all that was accomplished in 2020.

While the SG team had participated in many events for this year, we have responded to all social distancing guidelines and appropriate pandemic responses.

The SCHRADERGROUP Team

2020 marks SCHRADERGROUP’s sixteenth anniversary…
SCHRADERGROUP was established on April 15, 2004. Since then, SG has been recognized both regionally and nationally for functional and dynamic design that offers the highest degree of service to the user, responds to and respects both the built and natural environment, and demonstrates inspired aesthetics.

New location…SG started off 2020 by opening a new office location in Raleigh, North Carolina. With existing offices in Philadelphia, Lancaster and Baltimore, SG is now more committed than ever to providing dedicated academic and public safety design to all our long-standing clients across the country, as well as welcoming additional opportunities in the North Carolina region.

Keeping our community safe…SCHRADERGROUP's 3D printed face shield visors
As the COVID-19 pandemic initially caused a severe shortage of personal protective equipment (PPE) back in April, members of the SG team worked with Cornell University in their “Operation PPE” effort to provide protective gear for medical professionals. Sets of 3D printed face visors were paired with laser-cut shields and shipped to Mercy Catholic Medical Center in West Philadelphia.

Community Engagement

SG celebrated project initiations by attending several groundbreaking ceremonies…SCHRADERGROUP at UMASD HS GroundbreakingSG marked the beginning of construction of the Upper Merion Area School District’s (UMASD) new High School project with a Groundbreaking Ceremony. The 345,000 SF new facility connects the existing middle school through the athletic facilities creating a full secondary campus. The project was the result of a community-engaged master planning process and two successful UMASD elementary school projects.UMASD Front Facade

body img 2In August, SG attended the Groundbreaking Ceremony for the new Pennsylvania Department of Transportation (PennDOT) District 6-0 Regional Traffic Management Center (RTMC) and Parking Structure project. Designed to achieve a LEED Silver rating, the 2-story, 44,000 SF facility will expand PennDOT’s capabilities and enhance operations. The project is scheduled for completion in September 2022.PennDOT Site Entry-new

Event-1_SCHRADERGROUP_Community_College_of_Philadelphia_Groundbreaking_Ceremony_Dr_Generals_Mayor_Jim_KenneyManaging Partner David Schrader joined Philadelphia Mayor Jim Kenney and Philadelphia Community College president Dr. Donald Generals in the Groundbreaking Ceremony for the College’s new Career and Advanced Technology Center. The center will provide high-quality academic, career and technical programs to generate a thriving work force for the city’s transportation, manufacturing and healthcare fields. The facility is scheduled to open in 2022.
CCP 2020 02 19 CCP Rendering

 

SG projects reached completion…
While many projects were brought to conclusion, the pandemic eliminated the opportunity for the public to celebrate project completions through traditional ribbon cutting ceremonies. Although many ribbon cutting ceremonies were cancelled or postponed, SCHRADERGROUP is proud to showcase the following completed projects:
EPASD West Creek Blog SizeEast Pennsboro Area School District – West Creek Hills Elementary School & East Pennsboro Elementary School – Renovations
HASD Blog sizeHazelton Area School District – Eight Elementary/Middle Schools – Media Center/Classroom Renovations

In tune with our mission of community involvement, SG participated in the following events…

SG feature photoFollowing the district-wide facility assessment of Great Valley School District’s facilities, and just prior to the pandemic, SG supported a community workshop where participants commented on what they considered the main priorities for the district. The results of the workshop process were instrumental in developing a district plan for the next five to ten years.
SCHRADERGROUP attends PSU Career Day 2020Managing Partner David Schrader (PSU Class of 1991) and SG team members Eric Weiss (PSU Class of 2013) and Paige Geldrich (PSU Class of 2018) attended Pennsylvania State University’s 34th annual Stuckeman School Career Day in February, just prior to the pandemic. This day allows students a chance to network and explore careers in the fields of architecture, landscape architecture and graphic design. The SG team has participated in PSU’s Opportunities Week for years now, and always welcomes the opportunity to connect with future PSU graduates, other university graduates, and future architects.
Royalty Free GolfThe SCHRADERGROUP team attended two charity golf outings this year, the North Penn School District Educational Foundation’s 19th Annual Golf Classic and the Springfield Area Educational Foundation Annual Charity Golf Outing. SG is always looking for opportunities to assist in raising charitable funds for local school districts and is proud to support organizations that are committed to enriching the education and lives of students.

Presenting to the community…

In November, SCHRADERGROUP participated in two virtual presentations for local school district classes informing students of the architectural processes involved in our projects.

SG Project Manager Dan D’Amico presented to Upper Merion Area School District’s School Board and community a video update on the High School construction project. He then went on to show the presentation to a tech class at the High School, providing students a chance to see the site plan, floor plan and renderings. You can view this presentation here.

Managing Partner David Schrader co-hosted a presentation to a class in Council Rock School District’s High School North in November as well. The presentation focused on green building and was hosted with CRSD Director of Operations Doug Taylor.

SG’s commitment to design and sustainability for the next generation will not cease because of the current pandemic. We plan to continue our dedication to educational facilities and the community that use them into the new year, whether those activities can be done safely in person or virtually.

Conferences + Events

The SG team made exciting new connections at various conferences and events this year…

SCHRADERGROUP attended various virtual conferences this year in lieu of the usual in-person events.

The SG team attended the PASBO Facilities, Transportation & Safety conference this year. This conference looks into three critical areas in school business: Facility Management, Student Transportation and School Safety.

Managing Partner David Schrader and Senior Project Manager Danielle Hoffer, along with Upper Merion Area School District Administrative Team Dr. John Toleno and Jonathan Bauer, hosted a virtual presentation at the Association for Learning Environments (A4LE) Annual Conference in November.

Additionally, SG Principal Harry Pettoni attended the North Carolina Sheriff’s Association Fall meeting in Carteret County, NC in November. The NCSA conference allows sheriffs and deputies to come together to talk about key issues facing law enforcement agencies across the state. The conference followed all CDC guidelines.

Awards + Recognition

SCHRADERGROUP is proud to announce the following awards we have received in 2020…
SCHRADERGROUP ENR MID ATLANTICSG is honored to earn a ranking once again in the Engineering News-Record (ENR) Mid-Atlantic’s Top Design Firms list for 2020. We share this honor with all of our dedicated clients and partners whose continued commitment made this #96 ranking possible. You can view the full list here.

BD+C 2020 HeaderWe are also proud to announce that SG has ranked in 9 categories in Building Design+Construction Magazine’s 2020 Giants 400 Report. SCHRADERGROUP ranked #85 in the Top Architecture/Engineering Firms category, #49 in Schools, #46 in Public Safety Facilities, #89 in Sports Facilities, #91 in University/College Facilities and #89 in Local Government Buildings. You can view the full list here.
SCHRADERGROUP is also proud to announce making it into Architectural Record’s 2020 Top 300 Architecture Firms list at #274. SG is humbled to be included in this prestigious list.

 

SG is equally proud of the recognition for the following projects this year…
LEED Gold Plaques
SG celebrated with the Council Rock School District (CRSD), D’Huy Engineering and Breslin Ridyard Fadero Architects at the official presentation of LEED Gold Plaques for CRSD’s Holland Middle School and Newtown Middle School projects. SG designed Holland Middle School while Breslin Ridyard Fadero Architects designed Newtown Middle School. The two teams worked in tandem to design these facilities at the same time in order to create a level of educational parity and similar aesthetics within the two facilities. CRSD, with D’Huy Engineering’s guidance, was able to secure an ACE grant for both projects.

SCHRADERGROUP_Holland Middle School_Learning by Design Spring 2020CRSD’s Holland Middle School was also recognized as an Outstanding Project by Spring issue of Learning by Design. The issue shows what can be achieved with a complete addition and renovation to transform a 1970’s middle school into a 21st century learning environment. You can view this issue here.
Looking to 2021 + Beyond

We thank you for all of the experiences we have had during 2020 and are excited for more opportunities in the new year!

Wishing you, your families and loved ones a Happy, Healthy New Year!

From all of us at

Schradergroup_Logo_transparent_cropped Enscape

Community College of Philadelphia Breaks Ground on New Career and Advanced Technology Center

SCHRADERGROUP (SG) attended the official ceremonial groundbreaking for the Community College of Philadelphia’s new Career and Advanced Technology Center on Wednesday, November 18th. Managing Partner David Schrader represented SG at the event which was also attended by Mayor Jim Kenney and the College’s president, Dr. Donald Generals.

As part of its mission to build a better and brighter future for Philadelphia, the College selected SCHRADERGROUP, in partnership with Lavallee Brensinger Architects, to transform the college’s West Philadelphia Regional Center into a new Career and Advanced Technology Center. The center will provide high-quality academic, career and technical programs for student’s entering the region’s workforce.

The main goal of the project was to create a dynamic, identity-focused center that provides students with programs that concentrate on career readiness and to generate a thriving workforce in Philadelphia’s transportation, manufacturing and healthcare fields.

The new 75,000 SF facility will include state-of-the-art advanced and adaptive technologies for instructional space and study areas as well as laboratory service bays for automobiles, small engine equipment and spaces for diesel technology. Programs offered include transportation and logistics technology training, advanced manufacturing training, entry-level healthcare career training and an innovation hub for small businesses and entrepreneurs.

Other notable features of the facility include LEED certification, energy efficient design utilizing copious amounts of natural daylight, green rooftops for students and community members, a second-floor patio and adjoining room for events, and a learning commons and multiple conference rooms for student collaboration.

The facility is scheduled to open in 2022.

SG is honored to work on this exciting project. To learn more, click here.

To learn more about the Community College of Philadelphia, click here.

School District of Springfield Township’s New Enfield K-2 Early Learning Center Opening this Fall

The School District of Springfield Township’s (SDST) Enfield K-2 Early Learning Center opens this Fall with great enthusiasm. The completion of the school is the culmination of years of planning, community input and teamwork to design a building that fosters early learning for district’s youngest students.

The new 105,000 square foot K-2 Early Learning Center (ELC) will serve as a replacement school for the K-1 Primary Center and will pull one grade out of the 2-5 elementary school to provide additional educational space. The reconfigured K-2/3-5 grade structure provided the district with new opportunities to tailor instruction to targeted age groupings.

The educational vision to enhance the learning experience through a student-centered, project-based learning approach to instruction laid the foundation for planning. As a result of a community workshop process, the hierarchy of space design and site planning spawned from the input of the group. The site access points, vehicular and bus circulation and parking, the adjacencies of the public spaces (multipurpose room/gymnasium and cafeteria) to the instructional areas, and how classroom wings of the building embrace the central outdoor learning courtyard (representative of the building ‘hugging’ the children) are all results of the community input received.

The main building entrance adjacent to the administration area anchors the interior street connection which provides access the gymnasium with stage and cafeteria. The street leads to the central core of the building featuring the learning resource center and STE(A)M programs and the educational focal point of the building, the learning stair. The educational areas can be secured to allow the use of the public spaces for community events after school hours.

Educationally, the space design of the new school supports a variety of instructional and learning opportunities. To create a sense of community for this younger age group within the context of the larger school, smaller learning communities were designed for each grade grouping. Each grade level wing branches out from the central core of the building and is supported by a large group instruction area to support collaborative activities for either single or multiple classroom instruction. Every two general classrooms share a small group instruction room facilitating individualized instruction. Classroom instruction and small and large-group spaces support project-based and personalized learning opportunities, differentiated instruction, the integration of technologies and STE[A]M experiences, and social and emotional learning experiences for all students.

Thank you to all that contributed to the design and construction of the new Enfield K-2 Early Learning Center. SCHRADERGROUP is grateful for this opportunity to create unique learning environments that correlate to SDST’s educational vision.

Enfield K-2 Early Learning Center

Learn more about the new Enfield K-2 Early Learning Center project here.

Hatboro-Horsham School District’s New Crooked Billet Elementary School Will Soon be Ready for Students

We are excited to announce that one of our new elementary schools is expected to be completed in early October 2020 and ready for students. Hatboro-Horsham School District’s (HHSD) 110,000 SF Crooked Billet Elementary School is the District’s most recent accomplishment in upgrading its aging facilities and is another symbol of rebirth in the community surrounding it. The new K-5 facility replaced the original 1950s elementary school on the same site and will accommodate a larger population of 600 students.

Important to the district and community was the preservation of the history of the site. The Battle of Crooked Billet landmark proudly displayed in front of the school anchors the primary entrance to the building. Adjacent to the main administration entrance, a two-story rotunda serves as an interactive learning space featuring the history of Crooked Billet. The rotunda is centrally located between the curricular areas for Science, Technology, Engineering, Arts and Math (STEAM) program including the STEAM classroom, Media Center, TV Studio and Art classroom. This central core of the building also serves as the transitional area between the public spaces such as the gymnasium and cafeteria, and the academic two-story classroom wing.

The classroom wing showcases an innovative academic layout. Four grade level classrooms are clustered together with each pair of classrooms sharing a small group instruction area. The grade level cluster is directly adjacent to a central large group instruction area where the entire grade level can gather. Each cluster is designed with its own unique color providing grade level identity and wayfinding. Student cubbies are located in the corridors to maximize classroom efficiency.

SCHRADERGROUP is grateful for this opportunity to team with HHSD for the design of Crooked Billet Elementary School. This successful collaborative experience has truly been a team effort resulting in a school that will serve the community for generations.

Learn more about Crooked Billet Elementary School here.

SCHRADERGROUP Ranks #96 on ENR Mid-Atlantic’s Top Design Firms 2020 List

SCHRADERGROUP ranks #96 on Engineering News-Record (ENR) Mid-Atlantic’s Top Design Firms list of 2020. This list ranks the largest Mid-Atlantic-based design firms, both publicly and privately held, based on design revenue. SCHRADERGROUP is proud to note that the firm’s ranking moved from #100 in 2019 to #96 for this year.

The SCHRADERGROUP team recognizes that we share this tremendous success with our clients and our partners. The team is humbled by the continued dedication of those same clients to their projects even during these challenging times. We thank our clients and look forward to a bright future filled with creating improved environments for living, learning, working and recreating.

View ENR Mid-Atlantic’s Top Design Firms 2020 List here.

SCHRADERGROUP Attends the Groundbreaking Ceremony for New PennDOT District 6-0 RTMC and Parking Structure Project

SCHRADERGROUP (SG) attended the Groundbreaking Ceremony marking the beginning of construction for the new Pennsylvania Department of Transportation (PennDOT) District 6-0 Regional Traffic Management Center (RTMC) and Parking Structure on August 20, 2020. SG and Heim Construction Company were selected by The Commonwealth of Pennsylvania Department of General Services and PennDOT to Design-Build these new facilities.

Designed to achieve a LEED Silver rating, the RTMC is a two-story, 44,000 SF building adjoining the existing PennDOT Engineering District 6-0 office in King of Prussia, Pennsylvania. This larger facility will expand PennDOT’s capabilities and enhance the operations of the existing center.

The Parking Structure project includes demolishing an existing parking garage to make way for the RTMC and building a new three-story, 87,800 SF parking structure accommodating 250 spaces.

This new facility is a key component toward future PennDOT expansion projects such as the, I-76 Corridor Comprehensive Transportation Management Plan and the Active Management project.

Construction of the RTMC will follow the new Parking Structure, with the entire project scheduled for completion in September 2022. SG is equally grateful and excited for this project’s success and will diligently continue to support its journey.

Visit PennDOT for additional project information here.

SCHRADERGROUP Attends Upper Merion Area School District’s Groundbreaking Ceremony for their New High School Project

SCHRADERGROUP (SG) attended the Groundbreaking Ceremony marking the beginning of the construction process for the Upper Merion Area School District’s new High School project.

Students, teachers, district administrators, elected officials and community members gathered to celebrate this promising new facility that will provide next-generation learning spaces for the students.

This 345,000 SF facility connects to the existing middle school through the athletic facilities creating a full secondary campus. A full competition gymnasium and competition swimming venue will be the connector to the middle school. A true “student commons” is the heart of the facility, designed as an “all-day” area for multiple activities. The students commons is a two-story atrium space with learning resources on the second level enhancing the research-and project-based components mixed with dining and food-based opportunities. After hours, this space supports pre-and post-activities for the athletic and performing arts complexes. The performing arts complex is a complete 650-seat theater with balcony and all supporting spaces. The UMASD students will have tremendous learning opportunities once this facility is complete.

After a community-engaged master planning process and two successful new elementary school projects, SG is honored to continue our partnership with UMASD on this highly anticipated state-of-the-art facility.

To learn more about the UMASD elementary school projects, click here.

To learn more about the UMASD High School project, click here.

SCHRADERGROUP Aids in the Fight Against COVID-19

Due to COVID-19 causing a dire need for personal protective equipment (PPE), the SCHRADERGROUP (SG) team joined efforts to print 3D face shield visors for local healthcare workers in need. Sets of 3D printed face visors were paired with a laser-cut shield and shipped to Mercy Catholic Medical Center in West Philadelphia on April 15, 2020.

3D printed face visor

The SG team decided to join Cornell University’s “Operation PPE” effort to provide protective gear for medical professionals. Cornell University started Operation PPE with the intent to use their on-campus digital fabrication facilities to produce temporary personal protection equipment for healthcare workers on the front lines. An open-source 3D print file was made available to produce the visor portion of a protective face shield. Architecture schools and firms around the world have joined the effort to produce this equipment in attempts to slow the curve. To learn more, click here.

SG is appreciative of Cornell University’s accessible solution that allows architecture schools and firms to aid in the fight against COVID-19. The SG team hopes to have made a difference for healthcare workers during this desperate time.

Great Valley School District Community Engages in Workshop to Plan for the Future

The Great Valley School District (GVSD) contracted with SCHRADERGROUP (SG) in 2019 to complete an assessment of the current district facilities (six schools plus the district office, district maintenance, bus garage and athletic stadium). That assessment reviewed current building use and examined associated costs for building improvements. In addition, the District commissioned DecisionInsite to prepare a demographic study and projected enrollments based on housing developments and housing turn-over within the district. By comparing current building capacities to the projected enrollments, the team determined the district’s ability to accommodate the anticipated student population for the next five to ten years. A review of that data was presented to the community in October 2019.

In November, the District and SG facilitated a community workshop where participants were asked to comment on what they considered as the main priorities for planning. Positioning the District to offer spaces to deliver 21st Century project-based curriculum, student transportation/travel time and size of schools were ranked as participants’ top priorities. To begin a discussion regarding possible solutions to address capacity issues, specifically at Great Valley Middle School, a series of options were presented that considered the current grade alignment, possible grade realignment and new construction. Participants talked through the options, posed questions and identified concerns related to each, and highlighted the potential benefits. At the close of the session, participants were asked to express their opinion about the options presented.

At the final workshop meeting in December, two questions were posed for discussion considering various grade configurations specific to school centers and the secondary school campus. The results of the workshop process will be instrumental as the District plans for the next five to ten years. The School Board of Directors will consider the findings of the District-wide Facility Study and Master Plan in early 2020 to identify the next planning steps for the Great Valley School District.